Cox Engineering performs cement core tests in its laboratory. The following standards have been set for each core test performed:Standard Hours or Quantity or Rate Standard PriceDirect materials 3 pounds $0.75 per poundDirect labor 0.4 hours $12 per hourVariable manufacturing overhead 0.4 hours $9 per hourDuring March, the laboratory performed 2,000 core tests. On March 1 no direct materials (sand) were on hand. Variable manufacturing overhead is assigned to core tests on the basis of standard direct labor-hours. The following events occurred during March:[1] 8,600 pounds of sand were purchased at a cost of $7,310.[2] 7,200 pounds of sand were used for core tests.[3] 840 actual direct labor-hours were worked at a cost of $8,610.[4] Actual variable manufacturing overhead incurred was $3,200.REQUIRED: (NOTE: You must show your computations)(a) The materials price variance for March is:(b) The materials quantity variance for March is:(c) The labor rate variance for March is:(d) The labor efficiency variance for March is:(e) The variable overhead efficiency variance for March is:
Answers: 1
Business, 21.06.2019 13:10, aaron2113
At the end of the year, blossom co. has pretax financial income of $561,000. included in the $561,000 is $73,000 interest income on municipal bonds, $25,000 fine for dumping hazardous waste, and depreciation of $64,400. depreciation for tax purposes is $48,300. compute income taxes payable, assuming the tax rate is 30% for all periods.
Answers: 2
Business, 21.06.2019 16:00, glowbaby123
Jodi is trying to save money for a down payment on a house. she invests $6,000 into an account paying 5.5% simple interest. for how long must she save if she needs $7,300 for the down payment? a. 2 years b. 3 years c. 4 years d. 5 years
Answers: 1
Business, 22.06.2019 07:20, staxeeyy767
Richardson hired j. c. flood company, a plumbing contractor, to correct a stoppage in the sewer line of her house. the plumbing company's 'snake' device, used to clear the line leading to the main sewer, became caught in the underground line. to release it, the company excavated a portion of the sewer line in richardson's backyard. in the process, the company discovered numerous leaks in a rusty, defective water pipe that ran parallel with the sewer line. to meet public regulations, the water pipe, of a type no longer approved for such service, had to be replaced either then or later, when the yard would have to be excavated again. the plumbing company proceeded to repair the water pipe. though richardson inspected the company's work daily and did not express any objection to the extra work involved in replacing the water pipe, she refused to pay any part of the total bill after the company completed the entire operation. j. c. flood company then sued richardson for the costs of labor and material it had furnished. (c) for what, if anything, should richardson be liable? explain."
Answers: 1
Cox Engineering performs cement core tests in its laboratory. The following standards have been set...
Mathematics, 23.07.2019 00:30
Mathematics, 23.07.2019 00:30
Computers and Technology, 23.07.2019 00:30
Health, 23.07.2019 00:30
History, 23.07.2019 00:30