Business, 16.07.2021 01:00, joshbee2014

The following labor standards have been established for a particular product: Standard labor hours per unit of output 4.8 hours
Standard labor rate $20.60 per hour
The following data pertain to operations concerning the product for the last month:
Actual hours worked 7,400 hours
Actual total labor cost $153,180
Actual output 1,500 units
Required:
a. What is the labor rate variance for the month?
b. What is the labor efficiency variance for the month?

answer
Answers: 3

Other questions on the subject: Business

image
Business, 21.06.2019 14:50, oneicyahdaley10
Baker industries’s net income is $24,000, its interest expense is $5,000, and its tax rate is 40%. its notes payable equals $27,000, long-term debt equals $75,000, and common equity equals $250,000. the firm finances with only debt and common equity, so it has no preferred stock. what are the firm’s roe and roic?
Answers: 2
image
Business, 22.06.2019 20:20, korireidkdotdot82021
Which of the following entries would be made to record the requisition of $12,000 of direct materials and $6,900 of indirect materials? (assume that indirect materials are included in raw materials inventory.) a. manufacturing overhead 18,900 raw materials inventory 18,900 b. wip inventory 12,000 manufacturing overhead 6,900 raw materials inventory 18,900 c. raw materials inventory 18,900 wip inventory 18,900 d. wip inventory 18,900 raw materials inventory 18,900
Answers: 1
image
Business, 22.06.2019 21:50, preguntassimples
Assume that (i) setups need to be completed first; (ii) a setup can only start once the batch has arrived at the resource, and (iii) all flow units of a batch need to be processed at a resource before any of the units of the batch can be moved to the next resource. process step 1 molding 2 painting 3 dressing setup time 15 min. 30 min. no setup processing time 0.25 min./unit 0.15 min./unit 0.30 min./unit which batch size would minimize inventory without decreasing the process capacity?
Answers: 1
image
Business, 23.06.2019 01:10, CarlsonB
1. alwaysrain irrigation, inc. would like to determine capacity requirements for the next four years. currently, two production lines are in place for making bronze and plastic sprinklers. three types of sprinklers are available in both bronze and plastic: 90-degree nozzle sprinklers, 180-degree nozzle sprinklers, and 360-degree nozzle sprinklers. management has forecast demand for the next four years as follows: both production lines can produce all the different types of nozzles. the bronze machines needed for the bronze sprinklers require two operators and can produce up to 12,000 sprinklers. the plastic injection molding machine needed for the plastic sprinklers requires four operators and can produce up to 200,000 sprinklers. three bronze machines and only one injection molding machine are available. what are the capacity requirements for the next four years? (assume that there is no learning.)
Answers: 1
Do you know the correct answer?
The following labor standards have been established for a particular product: Standard labor hours...

Questions in other subjects:

Konu
Mathematics, 21.05.2021 19:10
Konu
Mathematics, 21.05.2021 19:10
Konu
Mathematics, 21.05.2021 19:10