Business
Business, 31.05.2021 15:10, cbogrett

For 115 consecutive days, a process engineer has measured the temperature of champagne bottles as they are made ready for serving. Each day, she took a sample of 10 bottles. The average across all 1,150 bottles (115 days, 10 bottles per day) was 40 degrees Fahrenheit. The standard deviation across all bottles was 0.5 degree Fahrenheit. Required:
When constructing an X-bar chart, what would be the center line?

answer
Answers: 2

Other questions on the subject: Business

image
Business, 22.06.2019 10:20, christianconklin22
The following information is for alex corp: product x: revenue $12.00 variable cost $4.50 product y: revenue $44.50 variable cost $9.50 total fixed costs $75,000 what is the breakeven point assuming the sales mix consists of two units of product x and one unit of product y?
Answers: 3
image
Business, 22.06.2019 10:50, jadeafrias
You are evaluating two different silicon wafer milling machines. the techron i costs $285,000, has a three-year life, and has pretax operating costs of $78,000 per year. the techron ii costs $495,000, has a five-year life, and has pretax operating costs of $45,000 per year. for both milling machines, use straight-line depreciation to zero over the project’s life and assume a salvage value of $55,000. if your tax rate is 24 percent and your discount rate is 11 percent, compute the eac for both machines.
Answers: 3
image
Business, 22.06.2019 13:40, vanessam16
Salge inc. bases its manufacturing overhead budget on budgeted direct labor-hours. the variable overhead rate is $8.10 per direct labor-hour. the company's budgeted fixed manufacturing overhead is $74,730 per month, which includes depreciation of $20,670. all other fixed manufacturing overhead costs represent current cash flows. the direct labor budget indicates that 5,300 direct labor-hours will be required in september. the company recomputes its predetermined overhead rate every month. the predetermined overhead rate for september should be:
Answers: 3
image
Business, 22.06.2019 14:40, nathenq1839
Which of the following would classify as a general education requirement
Answers: 1
Do you know the correct answer?
For 115 consecutive days, a process engineer has measured the temperature of champagne bottles as th...

Questions in other subjects:

Konu
Mathematics, 05.05.2020 18:57