Business
Business, 29.05.2021 03:00, Husky19

There are two jobs to be assigned to two workers. The cost for worker A on job 1 is $5 and on job 2 is $8. The cost for worker B on job 1 is $10 and on job 2 is $12. How should the work be divided using the assignment method and what is the total cost

answer
Answers: 2

Other questions on the subject: Business

image
Business, 22.06.2019 07:20, staxeeyy767
Richardson hired j. c. flood company, a plumbing contractor, to correct a stoppage in the sewer line of her house. the plumbing company's 'snake' device, used to clear the line leading to the main sewer, became caught in the underground line. to release it, the company excavated a portion of the sewer line in richardson's backyard. in the process, the company discovered numerous leaks in a rusty, defective water pipe that ran parallel with the sewer line. to meet public regulations, the water pipe, of a type no longer approved for such service, had to be replaced either then or later, when the yard would have to be excavated again. the plumbing company proceeded to repair the water pipe. though richardson inspected the company's work daily and did not express any objection to the extra work involved in replacing the water pipe, she refused to pay any part of the total bill after the company completed the entire operation. j. c. flood company then sued richardson for the costs of labor and material it had furnished. (c) for what, if anything, should richardson be liable? explain."
Answers: 1
image
Business, 22.06.2019 09:40, bennett2968
Boone brothers remodels homes and replaces windows. ace builders constructs new homes. if boone brothers considers expanding into new home construction, it should evaluate the expansion project using which one of the following as the required return for the project?
Answers: 1
image
Business, 22.06.2019 11:10, henryzx900
How much are you willing to pay for a zero that matures in 10 years, has a face value of $1,000 and your required rate of return is 7%? round to the nearest cent. do not include a dollar sign in your answer. (i. e. if your answer is $432.51, then type 432.51 without $ sign)
Answers: 1
image
Business, 22.06.2019 11:30, jennybee12331
Money from an allowance or job is known as .
Answers: 3
Do you know the correct answer?
There are two jobs to be assigned to two workers. The cost for worker A on job 1 is $5 and on job 2...

Questions in other subjects: