An industrial park is being planned for a tract of land near the river. To prevent flood damage to the industrial buildings that will be built on this low-lying land, an earthen embankment can be constructed. The height of the embankment will be determined by an economic analysis of the costs and benefits. The following data has been gathered: Embankment Height Above Roadway (m) 2.0 Initial Cost $100,000
Embankment Height Above Roadway (m) 2.5 Initial Cost $165,000
Embankment Height Above Roadway (m) 3.0 Initial Cost $300,000
Embankment Height Above Roadway (m) 3.5 Initial Cost $400,000
Embankment Height Above Roadway (m) 4.0 Initial Cost $550,000
Flood Level Above Roadway (m) 2.0 Average Frequency that Flood Level Will Exceed Height: Once in 3 years
Flood Level Above Roadway (m) 2.5 Average Frequency that Flood Level Will Exceed Height: Once in 8 years
Flood Level Above Roadway (m) 3.0 Average Frequency that Flood Level Will Exceed Height: Once in 25 years
Flood Level Above Roadway (m) 3.5 Average Frequency that Flood Level Will Exceed Height: Once in 50 years
Flood Level Above Roadway (m) 4.0 Average Frequency that Flood Level Will Exceed Height: Once in 100 years

The embankment can be expected to last 50 years and will require no maintenance. Whenever the flood water flows over the embankment, $300,000 of damage occurs.

a. Should the embankment be built?
b. If so, to which of the five heights above the roadway? A 12% rate of return is required.

answer
Answers: 1

Other questions on the subject: Business

image
Business, 22.06.2019 20:00, enriqueliz1680
Beranek corp has $720,000 of assets, and it uses no debt--it is financed only with common equity. the new cfo wants to employ enough debt to raise the debt/assets ratio to 40%, using the proceeds from borrowing to buy back common stock at its book value. how much must the firm borrow to achieve the target debt ratio? a. $273,600b. $288,000c. $302,400d. $317,520e. $333,396
Answers: 3
image
Business, 22.06.2019 20:40, Blazingangelkl
Which one of the following statements is correct? process costing systems use periodic inventory systems. process costing systems assign costs to departments or processes for a time period. companies that produce many different products or services are more likely to use process costing systems. production is continuous when a job-order costing is used to ensure that adequate quantities are on hand.
Answers: 2
image
Business, 22.06.2019 21:20, hellodarkness14
What business practice contributed most to andrew carnegie’s ability to form a monopoly?
Answers: 1
image
Business, 22.06.2019 21:30, girlhooper4life11
Suppose that alexi and tony can sell all their street tacos for $2 each and all their cuban sandwiches for $7.25 each. if each of them worked 20 hours per week, how should they split their time between the production of street tacos and cuban sandwiches? what is their maximum joint revenue?
Answers: 3
Do you know the correct answer?
An industrial park is being planned for a tract of land near the river. To prevent flood damage to t...

Questions in other subjects:

Konu
Health, 26.08.2019 00:50
Konu
Mathematics, 26.08.2019 00:50
Konu
Mathematics, 26.08.2019 00:50