Business, 20.05.2021 18:10, shanasia76

A company wants to determine if the average shearing strength of all rivets manufactured is more than 1000 lbs. A sample of 25 rivets is selected and tested for the shearing strength. After calculation, the mean shearing strength of these 20 selected rivets is 1003.8 lbs and a 99% confidence interval is (1001.4, 1006.2) for the average shearing strength of all rivets manufactured. Which of the following statement is true? A- The average shearing strength of all rivets manufactured is1003.8lbs.
B- The average shearing strength of all rivets manufactured must be between 1001.4 and1006.2.
C- We are 99% confident that the average shearing strength of all rivets manufactured is more than 1000 lbs.
D- At 90% confidence level, we know that the average shearing strength of all rivets manufactured is between 1001.4 and 1006.2 lbs.

answer
Answers: 3

Other questions on the subject: Business

image
Business, 21.06.2019 22:00, QueenNerdy889
If a bond is issued at a premium the effective interest rate is most likely
Answers: 2
image
Business, 22.06.2019 12:50, HarleyQuinn117
Performance bicycle company makes steel and titanium handle bars for bicycles. it requires approximately 1 hour of labor to make one handle bar of either type. during the most recent accounting period, barr company made 7,700 steel bars and 2,300 titanium bars. setup costs amounted to $35,000. one batch of each type of bar was run each month. if a single company-wide overhead rate based on direct labor hours is used to allocate overhead costs to the two products, the amount of setup cost assigned to the steel bars will be:
Answers: 2
image
Business, 22.06.2019 13:30, lemmeboiz43
The fiscal 2016 financial statements of nike inc. shows average net operating assets (noa) of $8,450 million, average net nonoperating obligations (nno) of $(4,033) million, average total liabilities of $9,014 million, and average equity of $12,483 million. the company's 2016 financial leverage (flev) is: select one: a. (0.477) b. (0.559 c. (0.323) d. (0.447) e. there is not enough information to determine the ratio.
Answers: 2
image
Business, 22.06.2019 16:30, AriaMartinez
Corrective action must be taken for a project when (a) actual progress to the planned progress shows the progress is ahead of schedule. (b) the technical specifications have been met. (c) the actual cost of the activities is less than the funds received for the work completed. (d) the actual progress is less than the planned progress.
Answers: 2
Do you know the correct answer?
A company wants to determine if the average shearing strength of all rivets manufactured is more tha...