Business
Business, 19.05.2021 20:20, julie426

All of Lgbtq ppl are any of you up to watch lgbtq videos?
I'll give brainlest

answer
Answers: 1

Other questions on the subject: Business

image
Business, 21.06.2019 16:10, RayeK168
Braverman company has two manufacturing departments—finishing and fabrication. the predetermined overhead rates in finishing and fabrication are $18.00 per direct labor-hour and 110% of direct materials cost, respectively. the company’s direct labor wage rate is $16.00 per hour. the following information pertains to job 700: finishing fabrication direct materials $ 410 $ 60 direct labor $ 128 $ 48 required: 1. what is the total manufacturing cost assigned to job 700? 2. if job 700 consists of 15 units, what is the unit product cost for this job?
Answers: 1
image
Business, 22.06.2019 09:50, thanitoast84
Acar manufacturer uses new machines that automatically assemble an engine from parts fed to the system. the machine can regulate the speed ofassembly depending on the number of parts produced. which type of technology does this machine use? angenoem mense wat ons in matin en esta va ser elthe machine uses
Answers: 3
image
Business, 22.06.2019 16:00, ella3714
Three pounds of material a are required for each unit produced. the company has a policy of maintaining a stock of material a on hand at the end of each quarter equal to 30% of the next quarter's production needs for material a. a total of 35,000 pounds of material a are on hand to start the year. budgeted purchases of material a for the second quarter would be:
Answers: 1
image
Business, 22.06.2019 19:10, keenansimpkinsoy0oqc
Imagine us is a startup that offers high definition 3d prenatal ultrasounds for high-end customers. the service process includes four activities that are conducted in the sequence described below. (the time required for each activity is shown in parentheses): activity 1: welcome a patient and explain the procedure. (20 minutes)activity 2: prep the patient (e. g., show them to the room, apply ultrasound gel). (17 minutes) (*your id number represents the amount of time needed to complete this task)activity 3: take images. (5 minutes)activity 4: discuss diagnostic with patient. (20 minutes)at each location there are employees (servers) s1, s2, and s3. the assignment of tasks to servers is the following: s1 does activities 1 and 2.s2 does activity 3.s3 does activity 4.a. what is the capacity of this process (in customers per hour)? b. suppose 3 patients arrive every hour on average. ignoring any “start of day” or “end of day” effects, what are the utilizations of all three servers (%)? c. suppose each activity can be done by any server and any server can do any set of activities. however, each activity is done by only one server. for example, a possible assignment includes: s1 does activity 1, s2 does activity 2, and s3 does activities 3 and 4. of course, the original assignment of servers to activities is also feasible. what is the maximum capacity of the process (in customers per hour)? d. now consider the capacity measures in (c) and (a), what is the percentage change? why can you improve capacity without using additional resources? (there is no free lunch, right? )note: for all hw assignments, show your process of getting the results. only providing the final answers is not acceptable and will get 0%. if necessary, use a separate sheet of paper to show your work.
Answers: 3
Do you know the correct answer?
All of Lgbtq ppl are any of you up to watch lgbtq videos?
I'll give brainlest...

Questions in other subjects:

Konu
English, 12.10.2020 22:01
Konu
Biology, 12.10.2020 22:01
Konu
Health, 12.10.2020 22:01
Konu
Mathematics, 12.10.2020 22:01