Business
Business, 24.04.2021 04:20, kcdavis318

An industrial park is being planned for a tract of land near the river. To prevent flood damage to the industrial buildings that will be built on this low-lying land, an earthen embankment can be constructed. The height of the embankment will be determined by an economic analysis of the costs and benefits. The following data have been gathered: Embankment Height Above Roadway (m) Initial Cost 2.0 $100,000 2.5 165,000 3.0 300,000 3.5 400,000 4.0 550,000 Flood Level Above Roadway (m) Average Frequency That Flood Level Will Exceed Height in Col. 1 2.0 Once in 3 years 2.5 Once in 8 years 3.0 Once in 25 years 3.5 Once in 50 years 4.0 Once in 100 years The embankment can be expected to last 50 years and will require no maintenance. Whenever the flood water flows over the embankment, $300,000 of damage occurs. Determine which of the five heights above the roadway should be selected. The interest rate is 12%. (50 points)

answer
Answers: 2

Other questions on the subject: Business

image
Business, 22.06.2019 11:50, vdirectioner7634
The basic difference between macroeconomics and microeconomics is that: a. microeconomics looks at the forest (aggregate markets) while macroeconomics looks at the trees (individual markets). b. macroeconomics is concerned with groups of individuals while microeconomics is concerned with single countries. c. microeconomics is concerned with the trees (individual markets) while macroeconomics is concerned with the forest (aggregate markets). d. macroeconomics is concerned with generalization while microeconomics is concerned with specialization.
Answers: 3
image
Business, 22.06.2019 14:30, violetvinny
crow design, inc. is a web site design and consulting firm. the firm uses a job order costing system in which each client is a different job. crow design assigns direct labor, licensing costs, and travel costs directly to each job. it allocates indirect costs to jobs based on a predetermined overhead allocation rate, computed as a percentage of direct labor costs. direct labor hours (professional) 6,250 hours direct labor costs ($1,800,000 support staff salaries ,000 computer ,000 office ,000 office ,000 in november 2012, crow design served several clients. records for two clients appear here: delicious treats mesilla chocolates direct labor 700 hours 100 hours software licensing $ 4,000 $400 travel costs 8,000 1. compute crow design’s direct labor rate and its predetermined indirect cost allocation rate for 2012. 2. compute the total cost of each job. 3. if simone wants to earn profits equal to 50% of service revenue, how much (what fee) should she charge each of these two clients? 4. why does crow design assign costs to jobs?
Answers: 2
image
Business, 22.06.2019 15:20, sgalvis455
Abank has $132,000 in excess reserves and the required reserve ratio is 11 percent. this means the bank could have in checkable deposit liabilities and in (total) reserves.
Answers: 3
image
Business, 22.06.2019 16:30, emmmssss21
Bernard made a gift of $500,000 to his brother in 2014. due to bernard’s prior taxable gifts he paid $200,000 of gift tax. when bernard died in 2019, the applicable gift tax credit had increased. at bernard’s death, what amount related to the $500,000 gift to his brother is included in his gross estate?
Answers: 3
Do you know the correct answer?
An industrial park is being planned for a tract of land near the river. To prevent flood damage to t...

Questions in other subjects:

Konu
Mathematics, 25.03.2020 18:30