Business
Business, 23.04.2021 04:40, wibi1963

Swizer Industries has two separate divisions. Division X has less risk so its projects are assigned a discount rate equal to the firm's WACC minus .75 percent. Division Y has more risk and its projects are assigned a rate equal to the firm's WACC plus 1 percent. The company has a debt-equity ratio of .48 and a tax rate of 34 percent. The cost of equity is 15.4 percent and the aftertax cost of debt is 5.4 percent. Presently, each division is considering a new project. Division Y's project provides a return of 12.9 percent while Division X's project is expected to earn 11.5 percent. Which project(s), if any, should the company accept

answer
Answers: 1

Other questions on the subject: Business

image
Business, 21.06.2019 21:40, icemaniac
Tandard product costs deerfield company manufactures product m in its factory. production of m requires 2 pounds of material p, costing $4 per pound and 0.5 hour of direct labor costing, $10 per hour. the variable overhead rate is $8 per direct labor hour, and the fixed overhead rate is $12 per direct labor hour. what is the standard product cost for product m? direct material answer direct labor answer variable overhead answer fixed overhead answer standard product cost per unit answer
Answers: 1
image
Business, 22.06.2019 11:20, smn43713
Which stage of group development involves members introducing themselves to each other?
Answers: 3
image
Business, 22.06.2019 19:50, crzyemo865
Aproduction line has three machines a, b, and c, with reliabilities of .96, .86, and .85, respectively. the machines are arranged so that if one breaks down, the others must shut down. engineers are weighing two alternative designs for increasing the line’s reliability. plan 1 involves adding an identical backup line, and plan 2 involves providing a backup for each machine. in either case, three machines (a, b, and c) would be used with reliabilities equal to the original three. a. compute overall system reliability under plan 1. (round your intermediate calculations and final answer to 4 decimal places.) reliability b. compute overall system reliability under plan 2. (round your intermediate calculations and final answer to 4 decimal places.) reliability c. which plan will provide the higher reliability? plan2plan1
Answers: 3
image
Business, 22.06.2019 20:20, lllmmmaaaooo
Trade will take place: a. if the maximum that a consumer is willing and able to pay is less than the minimum price the producer is willing and able to accept for a good. b. if the maximum that a consumer is willing and able to pay is greater than the minimum price the producer is willing and able to accept for a good. c. only if the maximum that a consumer is willing and able to pay is equal to the minimum price the producer is willing and able to accept for a good. d. none of the above.
Answers: 3
Do you know the correct answer?
Swizer Industries has two separate divisions. Division X has less risk so its projects are assigned...

Questions in other subjects: