Business
Business, 22.04.2021 22:40, raiindrxp

Which of the following is not a way to accomplish an activity cost reduction? a. improve operations so that the activity-base usage per unit is reduced b. use lower-cost materials c. change the classification of employees doing an activity so as to decrease the activity rate d. none of the above

answer
Answers: 3

Other questions on the subject: Business

image
Business, 22.06.2019 02:00, zykia1002
Greater concern for innovation and quality has shifted the job trend to using more broadly defined jobs. t/f
Answers: 1
image
Business, 22.06.2019 19:00, chloesmolinski0909
Why is accountability important in managing safety
Answers: 2
image
Business, 22.06.2019 19:50, crzyemo865
Aproduction line has three machines a, b, and c, with reliabilities of .96, .86, and .85, respectively. the machines are arranged so that if one breaks down, the others must shut down. engineers are weighing two alternative designs for increasing the line’s reliability. plan 1 involves adding an identical backup line, and plan 2 involves providing a backup for each machine. in either case, three machines (a, b, and c) would be used with reliabilities equal to the original three. a. compute overall system reliability under plan 1. (round your intermediate calculations and final answer to 4 decimal places.) reliability b. compute overall system reliability under plan 2. (round your intermediate calculations and final answer to 4 decimal places.) reliability c. which plan will provide the higher reliability? plan2plan1
Answers: 3
image
Business, 22.06.2019 21:30, robert7248
Consider the following three bond quotes; a treasury note quoted at 87.25, and a corporate bond quoted at 102.42, and a municipal bond quoted at 101.45. if the treasury and corporate bonds have a par value of $1,000 and the municipal bond has a par value of $5,000, what is the price of these three bonds in dollars? multiple choice $872.50, $1,000, $1,000, respectively $1,000, $1,024.20, $1,001.45, respectively $872.50, $1,024.20, $5,072.50, respectively $1,000, $1,000, $1,000, respectively
Answers: 3
Do you know the correct answer?
Which of the following is not a way to accomplish an activity cost reduction? a. improve operations...