Yur i posted on ig and these my pics
...
Answers: 1
Business, 22.06.2019 19:00, mazolethrin3461
The following are budgeted data: january february march sales in units 16,200 22,400 19,200 production in units 19,200 20,200 18,700 one pound of material is required for each finished unit. the inventory of materials at the end of each month should equal 20% of the following month's production needs. purchases of raw materials for february would be budgeted to be:
Answers: 3
Business, 22.06.2019 19:50, crzyemo865
Aproduction line has three machines a, b, and c, with reliabilities of .96, .86, and .85, respectively. the machines are arranged so that if one breaks down, the others must shut down. engineers are weighing two alternative designs for increasing the lineās reliability. plan 1 involves adding an identical backup line, and plan 2 involves providing a backup for each machine. in either case, three machines (a, b, and c) would be used with reliabilities equal to the original three. a. compute overall system reliability under plan 1. (round your intermediate calculations and final answer to 4 decimal places.) reliability b. compute overall system reliability under plan 2. (round your intermediate calculations and final answer to 4 decimal places.) reliability c. which plan will provide the higher reliability? plan2plan1
Answers: 3
Business, 22.06.2019 22:00, nsg0686
Acontractor was awarded a purchase order for commercial items for $1.5 million under the authority of far subpart 13.5. the purchase order was issued in november 2010 and containedall applicable clauses that were current as of the date of the purchase order. under the purchase order, the contractor is required to comply with a small business subcontracting plan that contains all of the required elements. which of the following is true? a. the contractor must submit a standard form 294, subcontracting report for individual contracts. b. the contractor must submit an individual subcontracting report through the electronic subcontracting reporting system (esrs). c. the contractor may submit either an sf 294 or report its subcontracting through esrs. d. the contractor is not required to submit any subcontracting reports.
Answers: 1
Mathematics, 28.04.2021 01:00
Mathematics, 28.04.2021 01:00
Mathematics, 28.04.2021 01:00
Mathematics, 28.04.2021 01:00
Spanish, 28.04.2021 01:00