Business
Business, 20.04.2021 16:30, 2021andrewkell

The Crunchies Snack Food Company packages potato chips in bags. The net weight of the chips in each bag is designed to be 9.0 oz, with a tolerance of /- 0.5 oz. The packaging process results in bags with an average net weight of 8.80 oz and a standard deviation of 0.12 oz. The company wants to determine if the process is capable of meeting design specifications. What is the Cp and what does it tell you about the capability of the process

answer
Answers: 3

Other questions on the subject: Business

image
Business, 21.06.2019 12:30, gsls6165
(blank) is the type of competition that occurs in a competitive market without identical producers.
Answers: 1
image
Business, 21.06.2019 20:40, stephanie37766
Ail industries uses activity-based costing to assist management in setting prices for the company's three major product lines. the following information is available: activity cost pool estimated overhead expected use of cost driver per activity cutting $1,000,000 25,000 labor hours stitching 8,000,000 320,000 machine hours inspections 2,800,000 160,000 labor hours packing 960,000 64,000 finished goods units compute the activity-based overhead rates. (round answers to 2 decimal places, e. g. 12.25.)
Answers: 2
image
Business, 22.06.2019 10:00, lm942747
What is the difference between an "i" statement and a "you" statement? a. the "i" statement is non-confrontational b. the "you" statement is non-confrontational c. the "i" statement is argumentative d. the "you" statement is neutral in tone select the best answer from the choices provided
Answers: 1
image
Business, 22.06.2019 11:40, lmiranda5034
Zachary company produces commercial gardening equipment. since production is highly automated, the company allocates its overhead costs to product lines using activity-based costing. the costs and cost drivers associated with the four overhead activity cost pools follow: activities unit level batch level product level facility level cost $ 64,800 $ 27,730 $ 15,000 $ 154,000 cost driver 2,400 labor hrs. 47 setups percentage of use 11,000 units production of 780 sets of cutting shears, one of the company’s 20 products, took 240 labor hours and 7 setups and consumed 15 percent of the product-sustaining activities. required: (a) had the company used labor hours as a company wide allocation base, how much overhead would it have allocated to the cutting shears? (b) how much overhead is allocated to the cutting shears using activity-based costing? (c) compute the overhead cost per unit for cutting shears first using activity-based costing and then using direct labor hours for allocation if 780 units are produced. if direct product costs are $150 and the product is priced at 30 percent above cost for what price would the product sell under each allocation system? (d) assuming that activity-based costing provides a more accurate estimate of cost, indicate whether the cutting shears would be over- or underpriced if direct labor hours are used as an allocation base. explain how over-or undercosting can affect vaulker's profitability. (e) comment on the validity of using the allocated facility-level cost in the pricing decision. should other costs be considered in a cost- plus pricing decision? if so, which ones? what costs would you include if you were trying to decide whether to accept a special order?
Answers: 1
Do you know the correct answer?
The Crunchies Snack Food Company packages potato chips in bags. The net weight of the chips in each...

Questions in other subjects: