Business, 01.10.2019 21:00, studybug2306
Why is a high-quality bond typically considered a lower-risk investment than a stock?
Answers: 1
Business, 21.06.2019 21:40, icemaniac
Tandard product costs deerfield company manufactures product m in its factory. production of m requires 2 pounds of material p, costing $4 per pound and 0.5 hour of direct labor costing, $10 per hour. the variable overhead rate is $8 per direct labor hour, and the fixed overhead rate is $12 per direct labor hour. what is the standard product cost for product m? direct material answer direct labor answer variable overhead answer fixed overhead answer standard product cost per unit answer
Answers: 1
Business, 22.06.2019 02:00, 544620
Answer the following questions using the information below: southwestern college is planning to hold a fund raising banquet at one of the local country clubs. it has two options for the banquet: option one: crestview country club a. fixed rental cost of $1,000 b. $12 per person for food option two: tallgrass country club a. fixed rental cost of $3,000 b. $8.00 per person for food southwestern college has budgeted $1,800 for administrative and marketing expenses. it plans to hire a band which will cost another $800. tickets are expected to be $30 per person. local business supporters will donate any other items required for the event. which option has the lowest breakeven point?
Answers: 1
Business, 22.06.2019 02:30, maxicanofb0011
Based on the supply and demand theory, why do medical doctors earn higher wages than child-care workers?
Answers: 1
Business, 22.06.2019 07:20, staxeeyy767
Richardson hired j. c. flood company, a plumbing contractor, to correct a stoppage in the sewer line of her house. the plumbing company's 'snake' device, used to clear the line leading to the main sewer, became caught in the underground line. to release it, the company excavated a portion of the sewer line in richardson's backyard. in the process, the company discovered numerous leaks in a rusty, defective water pipe that ran parallel with the sewer line. to meet public regulations, the water pipe, of a type no longer approved for such service, had to be replaced either then or later, when the yard would have to be excavated again. the plumbing company proceeded to repair the water pipe. though richardson inspected the company's work daily and did not express any objection to the extra work involved in replacing the water pipe, she refused to pay any part of the total bill after the company completed the entire operation. j. c. flood company then sued richardson for the costs of labor and material it had furnished. (c) for what, if anything, should richardson be liable? explain."
Answers: 1
Why is a high-quality bond typically considered a lower-risk investment than a stock?...
Mathematics, 14.06.2021 21:30
Social Studies, 14.06.2021 21:30
Mathematics, 14.06.2021 21:30
English, 14.06.2021 21:30
Mathematics, 14.06.2021 21:30
Physics, 14.06.2021 21:30
Mathematics, 14.06.2021 21:30