Business
Business, 18.09.2019 11:30, Legoman29305

What is the purpose of subheadings in a application?

answer
Answers: 2

Other questions on the subject: Business

image
Business, 21.06.2019 21:00, coolkitty35
According to maslow's hierarchy of needs theory, which of the following would be an issue that requires the fulfillment of a lower order need? a)the need for a challenging project at work. b)the need for a promotion at work. c) the need to locate your business in an area with a low crime rate. d)the need for a mentor to you ascend within the company. none of the above
Answers: 3
image
Business, 21.06.2019 21:00, paolaf9996
Intronix uses copy editors, computer graphics specialists, and java programmers to produce ads for magazines and the internet. the average new ad for magazines typically requires 180 hours of a copy editor's time and 135 hours of a computer graphics specialist's time, whereas ads produced for the internet require 35 hours of copy editor time, 195 hours of computer graphics time, and 60 hours of a java programmer's time. lassie food, a dog food manufacturer, has hired intronix to produce ads in the next four week. although currently it considers magazine ads 3 times more valuable than internet ads, it still wishes to have at least 2 of each produced within the next four weeks. intronix has assigned up to 3 copy editors, 4 computer graphics specialists, and 1 java programmer, each committed to work up to 70 hours per week on the project. how many of each type of ad should be produced to maximize the overall value to lassie foods
Answers: 3
image
Business, 22.06.2019 05:50, marjae188jackson
Acompany that makes shopping carts for supermarkets and other stores recently purchased some new equipment that reduces the labor content of the jobs needed to produce the shopping carts. prior to buying the new equipment, the company used 6 workers, who produced an average of 79 carts per hour. workers receive $16 per hour, and machine coast was $49 per hour. with the new equipment, it was possible to transfer one of the workers to another department, and equipment cost increased by $11 per hour while output increased by four carts per hour. a) compute the multifactor productivity (mfp) (labor plus equipment) under the prior to buying the new equipment. the mfp (carts/$) = (round to 4 decimal places). b) compute the productivity changes between the prior to and after buying the new equipment. the productivity growth = % (round to 2 decimal places)
Answers: 3
image
Business, 22.06.2019 19:50, crzyemo865
Aproduction line has three machines a, b, and c, with reliabilities of .96, .86, and .85, respectively. the machines are arranged so that if one breaks down, the others must shut down. engineers are weighing two alternative designs for increasing the line’s reliability. plan 1 involves adding an identical backup line, and plan 2 involves providing a backup for each machine. in either case, three machines (a, b, and c) would be used with reliabilities equal to the original three. a. compute overall system reliability under plan 1. (round your intermediate calculations and final answer to 4 decimal places.) reliability b. compute overall system reliability under plan 2. (round your intermediate calculations and final answer to 4 decimal places.) reliability c. which plan will provide the higher reliability? plan2plan1
Answers: 3
Do you know the correct answer?
What is the purpose of subheadings in a application?...

Questions in other subjects:

Konu
Chemistry, 19.10.2020 09:01
Konu
Social Studies, 19.10.2020 09:01
Konu
Mathematics, 19.10.2020 09:01
Konu
Mathematics, 19.10.2020 09:01