Thakin Industries Inc. manufactures dorm furniture in separate processes. In each process, materials are entered at the beginning, and conversion costs are incurred uniformly. Production and cost data for the first process in making two products in two different manufacturing plants are as follows: Production DataĆ¢July Plant 1 T12-Tables Plant 2 C10-Chairs

Work in process units, July 1 0 0
Units started into production 24,400 19,520
Work in process units, July 31 3,660 610
Work in process percent complete 60 80

Cost DataĆ¢July
Work in process, July 1 $0 $0
Materials 463,600 351,360
Labor 285,968 134,200
Overhead 126,880 127,856
Total $876,448 $613,416

Required:
a. For each plant compute the physical units of production.
b. For each plant compute equivalent units of production for materials and for conversion costs.
c. For each plant determine the unit costs of production. (Round unit costs to 2 decimal places, e. g. 5.25.)
d. For each plant show the assignment of costs to units transferred out and in process.

answer
Answers: 3

Other questions on the subject: Business

image
Business, 22.06.2019 07:30, suyi14
An important application of regression analysis in accounting is in the estimation of cost. by collecting data on volume and cost and using the least squares method to develop an estimated regression equation relating volume and cost, an accountant can estimate the cost associated with a particular manufacturing volume. consider the following sample of production volumes and total cost data for a manufacturing operation. production volume (units) total cost ($) 400 4000 450 5000 550 5400 600 5900 700 6400 750 7000 compute b 1 and b 0 (to 2 decimals if necessary). b 1 b 0 complete the estimated regression equation (to 2 decimals if necessary). = + x what is the variable cost per unit produced (to 1 decimal)? $ compute the coefficient of determination (to 4 decimals). note: report r 2 between 0 and 1. r 2 = what percentage of the variation in total cost can be explained by the production volume (to 2 decimals)? % the company's production schedule shows 500 units must be produced next month. what is the estimated total cost for this operation (to 2 decimals)? $
Answers: 1
image
Business, 22.06.2019 18:20, fantasticratz2
Principals are an administration career
Answers: 2
image
Business, 22.06.2019 19:10, keenansimpkinsoy0oqc
Imagine us is a startup that offers high definition 3d prenatal ultrasounds for high-end customers. the service process includes four activities that are conducted in the sequence described below. (the time required for each activity is shown in parentheses): activity 1: welcome a patient and explain the procedure. (20 minutes)activity 2: prep the patient (e. g., show them to the room, apply ultrasound gel). (17 minutes) (*your id number represents the amount of time needed to complete this task)activity 3: take images. (5 minutes)activity 4: discuss diagnostic with patient. (20 minutes)at each location there are employees (servers) s1, s2, and s3. the assignment of tasks to servers is the following: s1 does activities 1 and 2.s2 does activity 3.s3 does activity 4.a. what is the capacity of this process (in customers per hour)? b. suppose 3 patients arrive every hour on average. ignoring any ā€œstart of dayā€ or ā€œend of dayā€ effects, what are the utilizations of all three servers (%)? c. suppose each activity can be done by any server and any server can do any set of activities. however, each activity is done by only one server. for example, a possible assignment includes: s1 does activity 1, s2 does activity 2, and s3 does activities 3 and 4. of course, the original assignment of servers to activities is also feasible. what is the maximum capacity of the process (in customers per hour)? d. now consider the capacity measures in (c) and (a), what is the percentage change? why can you improve capacity without using additional resources? (there is no free lunch, right? )note: for all hw assignments, show your process of getting the results. only providing the final answers is not acceptable and will get 0%. if necessary, use a separate sheet of paper to show your work.
Answers: 3
image
Business, 22.06.2019 20:00, BigI80531
Later movers do not face: entrenched competitors. reduced uncertainty over technologies. high growth markets. lower market uncertainty.
Answers: 3
Do you know the correct answer?
Thakin Industries Inc. manufactures dorm furniture in separate processes. In each process, materials...

Questions in other subjects: