Business
Business, 18.03.2021 01:10, shyann78

Oak Ridge Steel Company has two departments, Casting and Rolling. In the Rolling Department, ingots from the Casting Department are rolled into steel sheet. The Rolling Department received 60,700 tons from the Casting Department. During July, the Rolling Department completed 74,500 tons, including 19,300 tons of work in process on July 1. The ending work in process inventory on July 31 was 5,500 tons. Required:
How many tons were started and completed during July?

answer
Answers: 1

Other questions on the subject: Business

image
Business, 22.06.2019 18:00, flowergirly34
Martha entered into a contract with terry, an art dealer. according to the contract, terry was to supply 18 th century artifacts to martha for the play she was directing, and martha was ready to pay $50,000 for this. another director needed the same artifacts and was ready to pay $60,000. terry decided not to sell the artifacts to martha. in this case, the court may order terry to:
Answers: 2
image
Business, 22.06.2019 19:50, ahoney2233
Statistical process control charts: a. indicate to the operator the true quality of material leaving the process. b. display upper and lower limits for process variables or attributes and signal when a process is no longer in control. c. indicate to the process operator the average outgoing quality of each lot. d. display the measurements on every item being produced. e. are a graphic way of classifying problems by their level of importance, often referred to as the 80-20 rule.
Answers: 2
image
Business, 22.06.2019 19:50, leannamat2106
At the beginning of 2014, winston corporation issued 10% bonds with a face value of $2,000,000. these bonds mature in five years, and interest is paid semiannually on june 30 and december 31. the bonds were sold for $1,852,800 to yield 12%. winston uses a calendar-year reporting period. using the effective-interest method of amortization, what amount of interest expense should be reported for 2014? (round your answer to the nearest dollar.)
Answers: 2
image
Business, 22.06.2019 20:20, wavymoney77yt
Direct materials (4.2 x $15) $ 63direct labor ($12 x 17.5) $210manufacturing overhead ($2.40 x 17.5) $42total job cost $ 315dougan, inc. allocates overhead based on a predetermined overhead rate of $2.40 per direct labor hour. employees are paid $12.00 per hour. job 24 requires 4.2 pounds of direct materials at a cost of $15.00 per pound. employees worked a total of 17.5 hours to complete the job. actual manufacturing overhead costs totaled $80,000 for the year for the company. how much is the cost of job 24?
Answers: 1
Do you know the correct answer?
Oak Ridge Steel Company has two departments, Casting and Rolling. In the Rolling Department, ingots...

Questions in other subjects:

Konu
Mathematics, 21.07.2019 00:50