Business
Business, 15.02.2021 23:50, mathhelppls14

Within the relevant range, a difference between variable costs and fixed costs is: Select one: A. variable costs per unit are constant and fixed costs per unit fluctuate. B. both total variable costs and total fixed costs fluctuate. C. both total variable costs and total fixed costs are constant. D. variable costs per unit fluctuate and fixed costs per unit remain constant. Clear my choice

answer
Answers: 2

Other questions on the subject: Business

image
Business, 22.06.2019 07:40, sistersquad
Myflvs -question 3 multiple choice worth 2 points)(10.04 hc)in panama city in january, high tide was at midnight. the water level at high tide was 9 feet and1 foot at low tide. assuming the next high tide is exactly 12 hours later and that the height of thewater can be modeled by a cosine curve, find an equation for water level in january for panamacity as a function of time (t).of(t) = 4 + 5of(t) = 5 cost + 4o 460) = 5 cos 1+ 4of(0) = 4 cos + 5
Answers: 1
image
Business, 22.06.2019 10:00, makennskyee1198
Carrie works at a canned food production factory. the government wanted to give a boost to the salt industry, so it lined up numerous subsidies and tax exemptions for the sector. this lead to a decrease in production costs. this also meant that consumers could access canned foods at a lower price, which lead to an increase in demand for the product. which kind of economic system is carrie’s company dealing with? carrie’s company is dealing with a/an economy.
Answers: 2
image
Business, 22.06.2019 11:00, smartie80
Why does an organization prepare a balance sheet? a. to reveal what the organization owns and owes at a point in time b. to reveal how well the company utilizes its cash c. to calculate retained earnings for a given accounting period d. to calculate gross profit for a given accounting period
Answers: 1
image
Business, 23.06.2019 01:20, Athenax
Boxes of honey nut oatmeal are produced to contain 16.0 ounces, with a standard deviation of 0.20 ounce. for a sample size of 49, the 3-sigma -x chart control limits areupper control limit (ucl-x) = ounceslower control limit =(lcl=max
Answers: 1
Do you know the correct answer?
Within the relevant range, a difference between variable costs and fixed costs is: Select one: A. va...

Questions in other subjects:

Konu
Mathematics, 03.07.2020 14:01
Konu
Engineering, 03.07.2020 14:01
Konu
Mathematics, 03.07.2020 14:01
Konu
Mathematics, 03.07.2020 14:01