Business
Business, 11.02.2021 22:00, helper49

The Business Cycle Dating Committee and the National Activity Index are two methods used to monitor the phases of the business cycle and determine when a recession occurs. Decide which method each of the six items describes and place it in the correct category. If the item does not describe either, then place it in the neither category. Business Cycle Dating Committee National Activity Index neither

answer
Answers: 1

Other questions on the subject: Business

image
Business, 22.06.2019 12:50, lily539711
Required information problem 15-1a production costs computed and recorded; reports prepared lo c2, p1, p2, p3, p4 [the following information applies to the questions displayed below. marcelino co.'s march 31 inventory of raw materials is $84,000. raw materials purchases in april are $540,000, and factory payroll cost in april is $364,000. overhead costs incurred in april are: indirect materials, $59,000; indirect labor, $26,000; factory rent, $38,000; factory utilities, $19,000; and factory equipment depreciation, $58,000. the predetermined overhead rate is 50% of direct labor cost. job 306 is sold for $670,000 cash in april. costs of the three jobs worked on in april follow. job 306 job 307 job 308 balances on march 31 direct materials $30,000 $36,000 direct labor 25,000 14,000 applied overhead 12,500 7,000 costs during april direct materials 133,000 210,000 $100,000 direct labor 105,000 150,000 101,000 applied overhead ? ? ? status on april 30 finished (sold) finished in process (unsold) required: 1. determine the total of each production cost incurred for april (direct labor, direct materials, and applied overhead), and the total cost assigned to each job (including the balances from march 31). a-materials purchases (on credit). b-direct materials used in production. c-direct labor paid and assigned to work in process inventory. d-indirect labor paid and assigned to factory overhead. e-overhead costs applied to work in process inventory. f-actual overhead costs incurred, including indirect materials. (factory rent and utilities are paid in cash.) g-transfer of jobs 306 and 307 to finished goods inventory. h-cost of goods sold for job 306. i-revenue from the sale of job 306. j-assignment of any underapplied or overapplied overhead to the cost of goods sold account. (the amount is not material.) 2. prepare journal entries for the month of april to record the above transactions. 3. prepare a schedule of cost of goods manufactured. 4.1 compute gross profit for april. 4.2 show how to present the inventories on the april 30 balance sheet.
Answers: 3
image
Business, 22.06.2019 19:20, needhelp243435
This problem has been solved! see the answerwhich of the following statements is correct? the consumer price index is a measure of the overall level of prices, whereas the gdp deflator is not a measure of the overall level of prices. if, in the year 2011, the consumer price index has a value of 123.50, then the inflation rate for 2011 must be 23.50 percent. compared to the gdp deflator, the consumer price index is the more common gauge of inflation. the consumer price index and the gdp deflator reflect the goods and services bought by consumers equally well.
Answers: 2
image
Business, 22.06.2019 22:20, arisworlld
With q7 assume the sweet company uses a plantwide predetermined overhead rate with machine-hours as the allocation base. and for q 10,11,13,and 14,assume that the company use department predetermined overhead rates with machine-hours as the allocation bade in both departements.7. assume that sweeten company used cost-plus pricing (and a markup percentage of 80% of total manufacturing cost) to establish selling prices for all of its jobs. what selling price would the company have established for jobs p and q? what are the selling prices for both jobs when stated on a per unit basis assuming 20 units were produced for job p and 30 units were produced for job q? (do not round intermediate calculations. round your final answers to nearest whole dollar.)total price for the job for job p -job q selling price per unit for job p q . how much manufacturing overhead was applied from the molding department to job p and how much was applied to job q? (do not round intermediate calculations.) job p job q manufacturing overhead applied for job p for job q . how much manufacturing overhead was applied from the fabrication department to job p and how much was applied to job q? (do not round intermediate calculations.)job p job q manufacturing overhead applied for job p for job q . if job q included 30 units, what was its unit product cost? (do not round intermediate calculations. round your final answer to nearest whole dollar.)14. assume that sweeten company used cost-plus pricing (and a markup percentage of 80% of total manufacturing cost) to establish selling prices for all of its jobs. what selling price would the company have established for jobs p and q? what are the selling prices for both jobs when stated on a per unit basis assuming 20 units were produced for job p and 30 units were produced for job q? (do not round intermediate calculations. round your final answer to nearest whole dollar.)total price for the job p for job q selling price per unit for job p for job q
Answers: 1
image
Business, 23.06.2019 00:00, dezmondpowell
Which of the following statements is true about an atm card?
Answers: 1
Do you know the correct answer?
The Business Cycle Dating Committee and the National Activity Index are two methods used to monitor...

Questions in other subjects:

Konu
Biology, 05.12.2021 05:10
Konu
Advanced Placement (AP), 05.12.2021 05:10