At Eady Corporation, maintenance is a variable overhead cost that is based on machine-hours. The performance report for July showed that actual maintenance costs totaled $13,680 and that the associated rate variance was $450 unfavorable. If 7,000 machine-hours were actually worked during July, the standard maintenance cost per machine-hour was:
Answers: 2
Business, 22.06.2019 07:40, sistersquad
Myflvs -question 3 multiple choice worth 2 points)(10.04 hc)in panama city in january, high tide was at midnight. the water level at high tide was 9 feet and1 foot at low tide. assuming the next high tide is exactly 12 hours later and that the height of thewater can be modeled by a cosine curve, find an equation for water level in january for panamacity as a function of time (t).of(t) = 4 + 5of(t) = 5 cost + 4o 460) = 5 cos 1+ 4of(0) = 4 cos + 5
Answers: 1
Business, 22.06.2019 13:30, lemmeboiz43
The fiscal 2016 financial statements of nike inc. shows average net operating assets (noa) of $8,450 million, average net nonoperating obligations (nno) of $(4,033) million, average total liabilities of $9,014 million, and average equity of $12,483 million. the company's 2016 financial leverage (flev) is: select one: a. (0.477) b. (0.559 c. (0.323) d. (0.447) e. there is not enough information to determine the ratio.
Answers: 2
At Eady Corporation, maintenance is a variable overhead cost that is based on machine-hours. The per...
Mathematics, 18.07.2019 07:30
Mathematics, 18.07.2019 07:30
Mathematics, 18.07.2019 07:30
Mathematics, 18.07.2019 07:30
Health, 18.07.2019 07:30