In 1993, Tamarisk Company completed the construction of a building at a cost of $2,320,000 and first occupied it in January 1994. It was estimated that the building will have a useful life of 40 years and a salvage value of $68,800 at the end of that time. Early in 2004, an addition to the building was constructed at a cost of $580,000. At that time, it was estimated that the remaining life of the building would be, as originally estimated, an additional 30 years, and that the addition would have a life of 30 years and a salvage value of $23,200. In 2022, it is determined that the probable life of the building and addition will extend to the end of 2053, or 20 years beyond the original estimate. Required:
a. Using the straight-line method, compute the annual depreciation that would have been charged from 1994 through 2003.
b. Compute the annual depreciation that would have been charged from 2004 through 2022.
c. Prepare the entry, if necessary, to adjust the account balances because of the revision of the estimated.
d. Compute the annual depreciation to be charged, beginning with 2022.

answer
Answers: 3

Other questions on the subject: Business

image
Business, 22.06.2019 07:30, ingle75
Fill in the missing words to correctly complete each sentence about analyzing a job posting. when reviewing a job posting, it’s important to check theto determine whether it’s worth your time to apply. if the post has been up for a while or it’s already closed, move on to the next position. if it’s still available, take note of when it closes so you’ll know when you mayfrom the company in regard to an interview.
Answers: 1
image
Business, 22.06.2019 19:10, keenansimpkinsoy0oqc
Imagine us is a startup that offers high definition 3d prenatal ultrasounds for high-end customers. the service process includes four activities that are conducted in the sequence described below. (the time required for each activity is shown in parentheses): activity 1: welcome a patient and explain the procedure. (20 minutes)activity 2: prep the patient (e. g., show them to the room, apply ultrasound gel). (17 minutes) (*your id number represents the amount of time needed to complete this task)activity 3: take images. (5 minutes)activity 4: discuss diagnostic with patient. (20 minutes)at each location there are employees (servers) s1, s2, and s3. the assignment of tasks to servers is the following: s1 does activities 1 and 2.s2 does activity 3.s3 does activity 4.a. what is the capacity of this process (in customers per hour)? b. suppose 3 patients arrive every hour on average. ignoring any “start of day” or “end of day” effects, what are the utilizations of all three servers (%)? c. suppose each activity can be done by any server and any server can do any set of activities. however, each activity is done by only one server. for example, a possible assignment includes: s1 does activity 1, s2 does activity 2, and s3 does activities 3 and 4. of course, the original assignment of servers to activities is also feasible. what is the maximum capacity of the process (in customers per hour)? d. now consider the capacity measures in (c) and (a), what is the percentage change? why can you improve capacity without using additional resources? (there is no free lunch, right? )note: for all hw assignments, show your process of getting the results. only providing the final answers is not acceptable and will get 0%. if necessary, use a separate sheet of paper to show your work.
Answers: 3
image
Business, 22.06.2019 20:00, davidaagurto
If a hotel has 100 rooms, and each room takes 25 minutes to clean, how many housekeepers working 8-hour shifts does the hotel need at 50 percent occupancy?
Answers: 1
image
Business, 22.06.2019 22:10, zahraa244
Afirm plans to begin production of a new small appliance. the manager must decide whether to purchase the motors for the appliance from a vendor at $10 each or to produce them in-house. either of two processes could be used for in-house production; process a would have an annual fixed cost of $200,000 and a variable cost of $7 per unit, and process b would have an annual fixed cost of $175,000 and a variable cost of $8 per unit. determine the range of annual volume for which each of the alternatives would be best. (round your first answer to the nearest whole number. include the indifference value itself in this answer.)
Answers: 2
Do you know the correct answer?
In 1993, Tamarisk Company completed the construction of a building at a cost of $2,320,000 and first...

Questions in other subjects:

Konu
Biology, 21.03.2020 07:32
Konu
Mathematics, 21.03.2020 07:32
Konu
Mathematics, 21.03.2020 07:32
Konu
Mathematics, 21.03.2020 07:33