Business
Business, 15.10.2020 20:01, elizabethivy75

Brace Corporation uses direct labor-hours in its predetermined overhead rate. At the beginning of the year, the estimated direct labor-hours were 21,600 hours. At the end of the year, actual direct labor-hours for the year were 20,400 hours, the actual manufacturing overhead for the year was $506,920, and manufacturing overhead for the year was underapplied by $23,440. The estimated manufacturing overhead at the beginning of the year used in the predetermined overhead rate must have been: A. $501,920
B. $531,445
C. $483,480
D. $511,920

answer
Answers: 1

Other questions on the subject: Business

image
Business, 21.06.2019 21:30, strikeboystorm
White company has two departments, cutting and finishing. the company uses a job-order costing system and computes a predetermined overhead rate in each department. the cutting department bases its rate on machine-hours, and the finishing department bases its rate on direct labor-hours. at the beginning of the year, the company made the following estimates: department cutting finishing direct labor-hours 6,000 30,000 machine-hours 48,000 5,000 total fixed manufacturing overhead cost $ 264,000 $ 366,000 variable manufacturing overhead per machine-hour $ 2.00 " variable manufacturing overhead per direct labor-hour " $ 4.00 required: 1. compute the predetermined overhead rate for each department. 2. the job cost sheet for job 203, which was started and completed during the year, showed the following: department cutting finishing direct labor-hours 6 20 machine-hours 80 4 direct materials $ 500 $ 310 direct labor cost $ 108 $ 360 using the predetermined overhead rates that you computed in requirement (1), compute the total manufacturing cost assigned to job 203. 3. would you expect substantially different amounts of overhead cost to be assigned to some jobs if the company used a plantwide predetermined overhead rate based on direct labor-hours, rather than using departmental rates?
Answers: 3
image
Business, 22.06.2019 00:40, tenleywood
The silverside company is considering investing in two alternative projects: project 1 project 2 investment $500,000 $240,000 useful life (years) 8 7 estimated annual net cash inflows for useful life $120,000 $40,000 residual value $32,000 $10,000 depreciation method straightminusline straightminusline required rate of return 11% 8% what is the accounting rate of return for project 2? (round any intermediary calculations to the nearest dollar, and round your final answer to the nearest hundredth of a percent, x. xx%.)
Answers: 3
image
Business, 22.06.2019 11:10, henryzx900
How much are you willing to pay for a zero that matures in 10 years, has a face value of $1,000 and your required rate of return is 7%? round to the nearest cent. do not include a dollar sign in your answer. (i. e. if your answer is $432.51, then type 432.51 without $ sign)
Answers: 1
image
Business, 22.06.2019 12:00, jybuccaneers2022
Agovernment receives a gift of cash and investments with a fair value of $200,000. the donor specified that the earnings from the gift must be used to beautify city-owned parks and the principal must be re-invested. the $200,000 gift should be accounted for in which of the following funds? a) general fund b) private-purpose trust fund c) agency fund d) permanent fund
Answers: 1
Do you know the correct answer?
Brace Corporation uses direct labor-hours in its predetermined overhead rate. At the beginning of th...

Questions in other subjects:

Konu
Physics, 04.01.2022 03:00
Konu
English, 04.01.2022 03:00
Konu
Mathematics, 04.01.2022 03:10