Jordana Woolens is a manufacturer of wool cloth. The information for March is as follows:
Beginning work in process 10,000 units
Units started 20,000 units
Units completed 25,000 units
Beginning work-in-process direct materials $6,000
Beginning work-in-process conversion $2,600
Direct materials added during month $30,000
Direct manufacturing labor during month $12,000
Factory overhead $5,000
Beginning work in process was half converted as to labor and overhead. Direct materials are added at the beginning of the process. All conversion costs are incurred evenly throughout the process. Ending work in process was 60% complete.
Required:
Prepare a production cost worksheet using the weighted-average method. Include any necessary supporting schedules.
Answers: 3
Business, 22.06.2019 08:50, sandram74691
Dyed-denim corporation is seeking to lower the costs of value creation and achieve a low-cost position. as a result, it plans to move its manufacturing plant from the u. s. to thailand, which based on company research, is the optimal location for production. this strategic move will most likely allow the company to realize
Answers: 3
Business, 22.06.2019 23:00, tonya3498
Which of the following is not one of the four principles of bottleneck management? a. increasing capacity at non-bottleneck stations is a mirageb. lost time at the bottleneck is lost system capacity. c. release work orders to the system at the bottleneck's capacity pace. d. increased bottleneck capacity is increased system capacity. e. bottlenecks should be moved to the end of the system process.
Answers: 1
Business, 22.06.2019 23:10, Schoolwork100
The direct labor budget of yuvwell corporation for the upcoming fiscal year contains the following details concerning budgeted direct labor-hours: 1st quarter 2nd quarter 3rd quarter 4th quarterbudgeted direct labor-hours 11,200 9,800 10,100 10,900the company uses direct labor-hours as its overhead allocation base. the variable portion of its predetermined manufacturing overhead rate is $6.00 per direct labor-hour and its total fixed manufacturing overhead is $80,000 per quarter. the only noncash item included in fixed manufacturing overhead is depreciation, which is $20,000 per quarter. required: 1. prepare the company’s manufacturing overhead budget for the upcoming fiscal year.2. compute the company’s predetermined overhead rate (including both variable and fixed manufacturing overhead) for the upcoming fiscal year.
Answers: 3
Jordana Woolens is a manufacturer of wool cloth. The information for March is as follows:
Beginning...
English, 20.01.2021 20:40
Spanish, 20.01.2021 20:40
English, 20.01.2021 20:40
Social Studies, 20.01.2021 20:40
Physics, 20.01.2021 20:40