A batch of material must visit two work stations in series to be converted into finished product. Each batch makes 100 units. Setup time at each work station is 30 minutes. Variable processing time is 3 minutes/unit and 5 minutes/unit in station 1 and station 2 respectively. After completing the operation the batch has to wait on average of 1 hour for the material handler to move it to the next machine. Assuming there is no time lost in waiting for the machines, find the time it takes for a batch of material to go through the system. Re-compute the completion time of a batch of 100 parts, if the batch size is reduced to 50. So now a batch of 50 is moved from machine 1 to maschine 2 as soon as it ready. Comment on the impact of reduction in batch size on completion time of 100 parts. Show that we can move parts through the system faster as we move them in smaller batches. What is the minimum time you can achieve to complete a batch of 100 parts?

answer
Answers: 1

Other questions on the subject: Business

image
Business, 21.06.2019 16:30, jenkuehn9220
Collective bargaining provides for a representative of employees to negotiate with a representative of management over labor issues including wages. true or false?
Answers: 3
image
Business, 22.06.2019 06:20, isaiahcannon6158
About time delivery co. incurred the following costs related to trucks and vans used in operating its delivery service: classify each of the costs as a capital expenditure or a revenue expenditure. 1. changed the oil and greased the joints of all the trucks and vans. 2. changed the radiator fluid on a truck that had been in service for the past four years. 3. installed a hydraulic lift to a van. 4. installed security systems on four of the newer trucks. 5. overhaul the engine on one of the trucks purchased three years ago. 6. rebuilt the transmission on one of the vans that had been driven 40,000 miles. the van was no longer under warranty. 7. removed a two-way radio from one of the trucks and installed a new radio with a greater range of communication. 8. repaired a flat tire on one of the vans. 9. replaced a truck's suspension system with a new suspension system that allows for the delivery of heavier loads. 10. tinted the back and side windows of one of the vans to discourage theft of contents.
Answers: 1
image
Business, 22.06.2019 22:10, tilsendt
Scoresby co. uses 6 machine hours and 2 direct labor hours to produce product x. it uses 8 machine hours and 16 direct labor hours to produce product y. scoresby's assembly and finishing departments have factory overhead rates of $240 per machine hour and $160 per direct labor hour, respectively. how much overhead cost will be charged to the two products? a. product x = $1,440; product y = $2,560 b. product x = $1,760; product y = $4,480 c. product x = $3,200; product y = $9,600 d. product x = $800; product y = $800
Answers: 1
image
Business, 22.06.2019 22:30, ninaaforever
Ellen and george work for the same company. ellen, a gen xer, really appreciates the flextime opportunities, while george, a baby boomer, takes advantage of the free computer training offered at the company. these policies are examples of
Answers: 3
Do you know the correct answer?
A batch of material must visit two work stations in series to be converted into finished product. Ea...

Questions in other subjects:

Konu
Mathematics, 08.05.2021 23:50
Konu
Mathematics, 08.05.2021 23:50
Konu
Mathematics, 08.05.2021 23:50
Konu
Mathematics, 08.05.2021 23:50