Business
Business, 13.10.2020 04:01, jazzy2971

During the next two months an automobile manufacturer must meet (on time) the following demands for trucks and cars: month 1, 400 trucks and 800 cars; month 2, 300 trucks and 300 cars. During each month at most 1000 vehicles can be produced. Each truck uses two tons of steel, and each car uses one ton of steel. During month 1, steel costs $700 per ton; during month 2, steel is projected to cost $800 per ton. At most 2500 tons of steel can be purchased each month. (Steel can be used only during the month in which it is purchased.) At the beginning of month 1, 100 trucks and 200 cars are in the inventory. At the end of each month, a holding cost of $200 per vehicle is assessed. Each car gets 35 miles per gallon (mpg), and each truck gets 15 mpg. During each month, the vehicles produced by the company must average at least 23 mpg. Required:
a. Determine how to meet the demand and mileage requirements at minimum total cost.
b. Explain intuitively what happens when the requirement is greater than 17 mpg.

answer
Answers: 2

Other questions on the subject: Business

image
Business, 22.06.2019 03:00, sayedaly2096
5. profit maximization and shutting down in the short run suppose that the market for polos is a competitive market. the following graph shows the daily cost curves of a firm operating in this market. 0 2 4 6 8 10 12 14 16 18 20 50 45 40 35 30 25 20 15 10 5 0 price (dollars per polo) quantity (thousands of polos) mc atc avc for each price in the following table, calculate the firm's optimal quantity of units to produce, and determine the profit or loss if it produces at that quantity, using the data from the previous graph to identify its total variable cost. assume that if the firm is indifferent between producing and shutting down, it will produce. (hint: you can select the purple points [diamond symbols] on the previous graph to see precise information on average variable cost.) price quantity total revenue fixed cost variable cost profit (dollars per polo) (polos) (dollars) (dollars) (dollars) (dollars) 12.50 135,000 27.50 135,000 45.00 135,000 if the firm shuts down, it must incur its fixed costs (fc) in the short run. in this case, the firm's fixed cost is $135,000 per day. in other words, if it shuts down, the firm would suffer losses of $135,000 per day until its fixed costs end (such as the expiration of a building lease). this firm's shutdown price—that is, the price below which it is optimal for the firm to shut down—is per polo.
Answers: 3
image
Business, 22.06.2019 05:30, 2023greenlanden
The hartman family is saving $400 monthly for ronald's college education. the family anticipates they will need to contribute $20,000 towards his first year of college, which is in 4 years .which best explain s whether the family will have enough money in 4 years ?
Answers: 1
image
Business, 22.06.2019 13:00, Killakyle4744
Amajor advantage of case studies is
Answers: 2
image
Business, 22.06.2019 15:20, sgalvis455
Abank has $132,000 in excess reserves and the required reserve ratio is 11 percent. this means the bank could have in checkable deposit liabilities and in (total) reserves.
Answers: 3
Do you know the correct answer?
During the next two months an automobile manufacturer must meet (on time) the following demands for...

Questions in other subjects:

Konu
Mathematics, 18.08.2020 18:01
Konu
Mathematics, 18.08.2020 18:01