Business
Business, 07.10.2020 23:01, tmax267

Required information SB (Static) Calculating Equivalent Units, Cost per Equivalent Unit, Reconciling the Cost of Work in Process [LO 3-2, 3-3, 3-S1] [The following information applies to the questions displayed below.] Silver Company manufactures kites and has the following information available for the month of April: Work in process, April 1 (100% complete for materials, 40% for conversion) 52,000 units Direct materials $ 80,000 Conversion cost $ 110,000 Number of units started 158,000 units April costs Direct materials $ 226,000 Conversion cost $ 336,000 Work in process, April 30 (100% complete for materials, 20% for conversion) 80,000 units E3-7 (Static) Weighted-Average Method [LO 3-2, 3-3] Required: Using the weighted-average method, complete each of the following steps: 1. Reconcile the number of physical units worked on during the period. 2. Calculate the number of equivalent units. 3. Calculate the cost per equivalent unit. 4. Reconcile the total cost of work in process.

answer
Answers: 3

Other questions on the subject: Business

image
Business, 21.06.2019 17:10, maehardy4134
Acompany manufactures hair dryers. it buys some of the components, but it makes the heating element, which it can produce at the rate of 920 per day. hair dryers are assembled daily, 250 days a year, at a rate of 360 per day. because of the disparity between the production and usage rates, the heating elements are periodically produced in batches of 2,300 units. a. approximately how many batches of heating elements are produced annually? b. if production on a batch begins when there is no inventory of heating elements on hand, how much inventory will be on hand 4 days later? c. what is the average inventory of elements, assuming each production cycle begins when there are none on hand?
Answers: 1
image
Business, 21.06.2019 20:00, krutikov686
Which is not an example of a cyclical company? a) airlines b) hotel industry c) medical d) theme parks
Answers: 1
image
Business, 21.06.2019 23:00, AshlynPlayz45
The monthly payment m of a loan of amount p for y years with an interest rate r can be calculated by the formula: m = p(r/12) 1 â’ (1 + r/12)â’12y calculate the monthly payment and the cummulative total payment for a $100,000 loan with an interest rate of 4.85% if taken out for 10 years, for 11 years, etc., up to a 30 year term. display the results in a three-column table where the first column is the number of years, the second is the monthly payment, and the third is the cummulative total payment. note: use format bank; for this problem. also, remember to represent the interest rate as a decimal (e. g. 0.0485) 2. a torus-shaped water tube is designed to have a volume of 8, 000in3 . the volume of the tube, v , and its surface area, s, are given by: v = 1 4 ď€ 2 (a + b)(b â’ a) 2 s = ď€ 2 (b 2 â’ a 2 ) if a = kb, determine s, a, and b for k = 0.2, 0.3, 0.7. display the results in a table
Answers: 1
image
Business, 22.06.2019 05:10, russboys3
The total value of your portfolio is $10,000: $3,000 of it is invested in stock a and the remainder invested in stock b. stock a has a beta of 0.8; stock b has a beta of 1.2. the risk premium on the market portfolio is 8%; the risk-free rate is 2%. additional information on stocks a and b is provided below. return in each state state probability of state stock a stock b excellent 15% 15% 5% normal 50% 9% 7% poor 35% -15% 10% what are each stock’s expected return and the standard deviation? what are the expected return and the standard deviation of your portfolio? what is the beta of your portfolio? using capm, what is the expected return on the portfolio? given your answer above, would you buy, sell, or hold the portfolio?
Answers: 1
Do you know the correct answer?
Required information SB (Static) Calculating Equivalent Units, Cost per Equivalent Unit, Reconciling...

Questions in other subjects: