Business
Business, 18.08.2020 16:01, ineedhelp2285

A budget that allocates increased or decreased funds to a department by using the last budget period as a reference point is called a(n). A) standardized budget B) fixed budget C) zero-based budget D) incremental budget E) tactical budget

answer
Answers: 3

Other questions on the subject: Business

image
Business, 22.06.2019 04:30, AM28
4. the condition requires that only one of the selected criteria be true for a record to be displayed.
Answers: 1
image
Business, 22.06.2019 05:50, mandy9386
Nichols inc. manufactures remote controls. currently the company uses a plantminuswide rate for allocating manufacturing overhead. the plant manager is considering switchingminusover to abc costing system and has asked the accounting department to identify the primary production activities and their cost drivers which are as follows: activities cost driver allocation rate material handling number of parts $5 per part assembly labor hours $20 per hour inspection time at inspection station $10 per minute the current traditional cost method allocates overhead based on direct manufacturing labor hours using a rate of $20 per labor hour. what are the indirect manufacturing costs per remote control assuming an method is used and a batch of 10 remote controls are produced? the batch requires 100 parts, 5 direct manufacturing labor hours, and 3 minutes of inspection time.
Answers: 2
image
Business, 22.06.2019 10:20, alayciaruffin076
What two things do you consider when evaluating the time value of money
Answers: 1
image
Business, 22.06.2019 12:20, Tierriny576
If jobs have been undercosted due to underallocation of manufacturing overhead, then cost of goods sold (cogs) is too low and which of the following corrections must be made? a. decrease cogs for double the amount of the underallocation b. increase cogs for double the amount of the underallocation c. decrease cogs for the amount of the underallocation d. increase cogs for the amount of the underallocation
Answers: 3
Do you know the correct answer?
A budget that allocates increased or decreased funds to a department by using the last budget period...

Questions in other subjects:

Konu
Arts, 10.02.2022 08:50