Business
Business, 24.07.2020 22:01, mayaleila

20. An emergency operations plan: A. Focuses on standard operating procedures for responding to one single type of incident. B. Serves primarily as a budgeting document for acquiring emergency management resources. C. Establishes the overall authority, roles, and functions performed during incidents. D. Is required in order for a jurisdiction to receive Federal assistance with mitigation initiatives.

answer
Answers: 3

Other questions on the subject: Business

image
Business, 22.06.2019 08:30, franstirlacci
Uppose that the federal reserve purchases a bond for $100,000 from donald truck, who deposits the proceeds in the manufacturer’s national bank. what will be the impact of this purchase on the supply of money? the money supply will increase by $100,000. the money supply will increase by $80,000. the money supply will increase by $500,000. this action will have no effect on the money supply. if the reserve requirement ratio is 20 percent, what is the maximum amount of additional loans that the manufacturer’s bank will be able to extend as the result of truck’s deposit? the maximum additional loans is $100,000. the maximum additional loans is $80,000. the maximum additional loans is $20,000. the maximum additional loans is $500,000. given the 20 percent reserve requirement, what is the maximum increase in the quantity of checkable deposits that could result throughout the entire banking system because of the fed’s action? this action will have no effect on the money supply. the money supply will eventually increase by $80,000. the money supply will eventually increase by $500,000. the money supply will eventually increase by $100,000.
Answers: 1
image
Business, 22.06.2019 14:20, kevinglvz
Anew 2-lane road is needed in a part of town that is growing. at some point the road will need 4 lanes to handle the anticipated traffic. if the city's optimistic estimate of growth is used, the expansion will be needed in 4 years and has a probability of happening of 40%. for the most likely and pessimistic estimates, the expansion will be needed in 8 and 15 years respectively. the probability of the pessimistic estimate happening is 20%. the expansion will cost $ 4.2 million and the interest rate is 8%. what is the expected pw the expansion will cost?
Answers: 1
image
Business, 22.06.2019 16:20, valdezavery1373
The assumptions of the production order quantity model are met in a situation where annual demand is 3650 units, setup cost is $50, holding cost is $12 per unit per year, the daily demand rate is 10 and the daily production rate is 100. the production order quantity for this problem is approximately:
Answers: 1
image
Business, 22.06.2019 20:30, joaquin42
Hank itzek manufactures and sells homemade wine, and he wants to develop a standard cost per gallon. the following are required for production of a 70-gallon batch. 2,700 ounces of grape concentrate at $0.04 per ounce 77 pounds of granulated sugar at $0.43 per pound 133 lemons at $0.79 each 350 yeast tablets at $0.24 each 350 nutrient tablets at $0.14 each 2,500 ounces of water at $0.001 per ounce hank estimates that 4% of the grape concentrate is wasted, 9% of the sugar is lost, and 32% of the lemons cannot be used. compute the standard cost of the ingredients for one gallon of wine. (round intermediate calculations and final answer to 2 decimal places, e. g.
Answers: 3
Do you know the correct answer?
20. An emergency operations plan: A. Focuses on standard operating procedures for responding to one...

Questions in other subjects:

Konu
Computers and Technology, 05.12.2021 21:20
Konu
Mathematics, 05.12.2021 21:20
Konu
Advanced Placement (AP), 05.12.2021 21:20
Konu
Mathematics, 05.12.2021 21:20