Business
Business, 08.07.2020 01:01, jayjayw64

The difference between the upper specification and the lower specification for a process is 0.600.60. The standard deviation is 0.100.10. Based on the given information, the process capability ratio, Upper C Subscript pCp = nothing (round your response to two decimal places). Based on the process capability ratio (Upper C Subscript pCp) for the given information, one can say that the process is to produce within the design specifications.

answer
Answers: 1

Other questions on the subject: Business

image
Business, 22.06.2019 08:30, shauntleaning
Match the given situations to the type of risks that a business may face while taking credit. 1. beta ltd. had taken a loan from a bank for a period of 15 years, but its sales are gradually showing a decline. 2. alpha ltd. has taken a loan for increasing its production and sales, but it has not conducted any research before making this decision. 3. delphi ltd. has an overseas client. the economy of the client’s country is going through severe recession. 4. delphi ltd. has taken a short-term loan from the bank, but its supply chain logistics are not in place. a. foreign exchange risk b. operational risk c. term of loan risk d. revenue projections risk
Answers: 3
image
Business, 22.06.2019 13:10, kell22wolf
Lin corporation has a single product whose selling price is $136 per unit and whose variable expense is $68 per unit. the company’s monthly fixed expense is $32,400. required: 1. calculate the unit sales needed to attain a target profit of $5,000. (do not round intermediate calculations.) 2. calculate the dollar sales needed to attain a target profit of $8,400.
Answers: 3
image
Business, 22.06.2019 14:20, kevinglvz
Anew 2-lane road is needed in a part of town that is growing. at some point the road will need 4 lanes to handle the anticipated traffic. if the city's optimistic estimate of growth is used, the expansion will be needed in 4 years and has a probability of happening of 40%. for the most likely and pessimistic estimates, the expansion will be needed in 8 and 15 years respectively. the probability of the pessimistic estimate happening is 20%. the expansion will cost $ 4.2 million and the interest rate is 8%. what is the expected pw the expansion will cost?
Answers: 1
image
Business, 22.06.2019 22:20, jaylaa04
Which of the following best explains why the demand for housing is more flexible than the supply? a. new housing developments are being constructed all the time. b. low interest rates for mortgages make buying a home very affordable. c. the increasing population always drives demand upwards. d. people can move more easily than producers can build new homes.
Answers: 1
Do you know the correct answer?
The difference between the upper specification and the lower specification for a process is 0.600.60...

Questions in other subjects:

Konu
Mathematics, 04.07.2019 11:10