Business
Business, 10.06.2020 19:57, shelbylynn1093

Calisto Launch Services is an independent space corporation and has been contracted to develop and launch one of two different satellites. Initial equipment will cost $750,000 for the first satellite and $850,000 for the second. Development will take 5 years at an expected cost of $150,000 per year for the first satellite; $120,000 per year for the second. The same launch vehicle can be used for either satellite and will cost $275,000 at the time of the launch 5 years from now. At the conclusion of the launch, the contracting company will pay Calisto $2,500,000 for either satellite. Calisto is also considering whether they should consider launching both satellites. Because Calisto would have to upgrade its facilities to handle two concurrent projects, the initial costs would rise by $150,000 in addition to the first costs of each satellite. Calisto would need to hire additional engineers and workers, raising the yearly costs to a total of $400,000. An additional compartment would be added to the launch vehicle at an additional cost of $75,000. As an incentive to do both, the contracting company will pay for both launches plus a bonus of $1,000,000. Using a present worth analysis with a MARR of 10 percent/year, what should Calisto Launch Services do?

answer
Answers: 1

Other questions on the subject: Business

image
Business, 22.06.2019 08:30, Maelynne8515
In risk management, what does risk control include? a. risk identification b. risk analysis c. risk prioritization d. risk management planning e. risk elimination need this answer now : (
Answers: 3
image
Business, 22.06.2019 16:50, cutebab4786
Slow ride corp. is evaluating a project with the following cash flows: year cash flow 0 –$12,000 1 5,800 2 6,500 3 6,200 4 5,100 5 –4,300 the company uses a 11 percent discount rate and an 8 percent reinvestment rate on all of its projects. calculate the mirr of the project using all three methods using these interest rates.
Answers: 2
image
Business, 22.06.2019 19:40, cieloromero1
Moody corporation uses a job-order costing system with a plantwide predetermined overhead rate based on machine-hours. at the beginning of the year, the company made the following estimates: machine-hours required to support estimated production 100,000 fixed manufacturing overhead cost $ 650,000 variable manufacturing overhead cost per machine-hour $ 3.00 required: 1. compute the plantwide predetermined overhead rate. 2. during the year, job 400 was started and completed. the following information was available with respect to this job: direct materials $ 450 direct labor cost $ 210 machine-hours used 40
Answers: 3
image
Business, 22.06.2019 20:20, abbz13
Which statement is not true about a peptide bond? which statement is not true about a peptide bond? the peptide bond has partial double-bond character. the carbonyl oxygen and the amide hydrogen are most often in a trans configuration with respect to one another. rotation is restricted about the peptide bond. the peptide bond is longer than the typical carbon-nitrogen bond.
Answers: 2
Do you know the correct answer?
Calisto Launch Services is an independent space corporation and has been contracted to develop and l...

Questions in other subjects:

Konu
Mathematics, 02.03.2020 06:12
Konu
Mathematics, 02.03.2020 06:13
Konu
Mathematics, 02.03.2020 06:13
Konu
Mathematics, 02.03.2020 06:13