Business
Business, 22.05.2020 03:12, issaaamiaaa15

Pikes Pizza is a new local lunch time pizza parlor with one store location. Pizza making is a multiple-step process. The first two steps, mixing the dough and making the sauce, can be done simultaneously during off peak times. Sauce and balls of dough can be refrigerated and stored. These activities are not included in the problem. During the lunch rush, there are three main steps to pizza making: assembly, baking, and boxing. Once an order is placed, the chef begins the assembly of the pizza. The chef takes the ball of dough and tosses the ball of dough into the round pizza crust. The chef spreads the sauce on the crust then adds the required toppings. The other friend completes the remaining steps of baking and boxing. The assembled pizza is placed in the oven and baked. The pizza is taken out of the oven, cut, and placed in a box for pick up. Customers pay for the pizza at the time of pick up. Pizzas come in three sizes. The oven can hold multiple pizzas at a time, but it is dependent on the size of the pizza. Pizzas can enter and exit the oven at any time as long as the number does not exceed the maximum. The following chart shows the time, material costs, price, and oven capacity for each pizza size.

For 1 Pizza Small Medium Large
Assembly
Tossing crust 2 minutes 3 minutes 4 minutes
Sauce and topping 2 minutes 2 minutes 3 minutes
Baking
Place in oven and baked 12 minutes 15 minutes 18 minutes
Boxing
Cutting/ paying 1 minute 1 minute 1 minute
Ingredient cost $2 $3 $4
Price $7 $8 $9
Max pizzas in Oven at one time 5 5 4

(a) Assuming that only large pizzas are sold at lunch, what is the maximum capacity of this system during the 2 hour lunch period? What part of the operation is the bottleneck? Please list any assumptions and discuss how you arrived at your conclusion.
(b) Pikes Pizza is considering running a special on small pizzas for lunch. The small pizza promotion would lower the price to $6 for a small pizza. Assuming that Pizza is operating at capacity at lunch and everyone will buy small pizzas, should Pizza offer a special lunch price small pizza?
(c) What are the challenges for scheduling the pizza operations? What capacity cushion would be appropriate? Why would you use a capacity cushion?

answer
Answers: 2

Other questions on the subject: Business

image
Business, 21.06.2019 20:40, eaarnold
Alocal club is selling christmas trees and deciding how many to stock for the month of december. if demand is normally distributed with a mean of 100 and standard deviation of 20, trees have no salvage value at the end of the month, trees cost $20, and trees sell for $50 what is the service level?
Answers: 2
image
Business, 22.06.2019 01:20, Adolfosbaby
As a project manager for a large construction company, shaun decided to make the performance appraisal process as painless as possible for his crew. he spent a considerable amount of time creating performance standards he felt were reasonable, and after six months' time, he scheduled individual appointments with each worker to discuss strengths and weaknesses and areas that needed improvement according to the standards he privately set. some employees were sent to vestibule training, and one even got a promotion with additional compensation. what did he fail to do correctly
Answers: 2
image
Business, 22.06.2019 02:00, Sumysumy
Southeastern bell stocks a certain switch connector at its central warehouse for supplying field service offices. the yearly demand for these connectors is 15,000 units. southeastern estimates its annual holding cost for this item to be $25 per unit. the cost to place and process an order from the supplier is $75. the company operates 300 days per year, and the lead time to receive an order from the supplier is 2 working days. a) find the economic order quantity. b) find the annual holding costs. c) find the annual ordering costs. d) what is the reorder point?
Answers: 2
image
Business, 22.06.2019 03:30, skylar1315
Used cars usually have options: higher depreciation rate than new cars lower financing costs than new cars lower insurance premiums than new cars lower maintenance costs than new cars
Answers: 1
Do you know the correct answer?
Pikes Pizza is a new local lunch time pizza parlor with one store location. Pizza making is a multip...

Questions in other subjects:

Konu
Mathematics, 16.02.2021 21:50
Konu
Chemistry, 16.02.2021 21:50
Konu
Mathematics, 16.02.2021 21:50