As a project manager of Very Good Construction you want to plan renting a fleet of 25 cu yd tractor-scrapers and have them hauling between the pit and a road construction job. The haul road is a rutted dirt road that deflects slightly under the load of the scraper. There is a slight grade of 2.5% from the pit to the fill location. Rolling resistance factor is assumed as 100 lbs/ton. The return road is effectively level. The haul distance to the dump location is 0.50 miles and the return distance is 1.50 miles. The scrapers are push loaded in the pit. The cycle time for the pusher is 1.50 minutes and the cycle time for the scrapers is 8 minutes. Assume that the weight on the wheels is 75 tons (full) and 50 tons (empty).

a. What are the rolling resistances and grade resistance?
b. What are the effective grades?
c. How many scrapers you recommend to be rented? Explain.
d. What is the production of the system in case 4 scrapers would be rented?

answer
Answers: 3

Other questions on the subject: Business

image
Business, 21.06.2019 20:40, Patricia2121
•broussard skateboard’s sales are expected to increase by 15% from $8 million in 2016 to $9.2 million in 2017. its assets totaled $5 million at the end of 2016. broussard is already at full capacity, so its assets must grow at the same rate as projected sales. at the end of 2016, current liabilities were $1.4 million, consisting of $450,000 of accounts payable, $500,000 of notes payable, and $450,000 of accruals. the after-tax profit margin is forecasted to be 6%, and the forecasted payout ratio is 40%. use the afn equation to forecast broussard’s additional funds needed for the coming year
Answers: 2
image
Business, 22.06.2019 07:30, suyi14
An important application of regression analysis in accounting is in the estimation of cost. by collecting data on volume and cost and using the least squares method to develop an estimated regression equation relating volume and cost, an accountant can estimate the cost associated with a particular manufacturing volume. consider the following sample of production volumes and total cost data for a manufacturing operation. production volume (units) total cost ($) 400 4000 450 5000 550 5400 600 5900 700 6400 750 7000 compute b 1 and b 0 (to 2 decimals if necessary). b 1 b 0 complete the estimated regression equation (to 2 decimals if necessary). = + x what is the variable cost per unit produced (to 1 decimal)? $ compute the coefficient of determination (to 4 decimals). note: report r 2 between 0 and 1. r 2 = what percentage of the variation in total cost can be explained by the production volume (to 2 decimals)? % the company's production schedule shows 500 units must be produced next month. what is the estimated total cost for this operation (to 2 decimals)? $
Answers: 1
image
Business, 22.06.2019 19:10, kingjustin0825
Below are the steps in the measurement process of external transactions. arrange them from first (1) to last (6). event step post transactions to the general ledger. assess whether the transaction results in a debit or credit to account balances. use source documents to identify accounts affected by an external transaction. analyze the impact of the transaction on the accounting equation. prepare a trial balance. record the transaction in a journal using debits and credits.
Answers: 3
image
Business, 22.06.2019 22:00, tiasoraw
What tax is paid by the most people in the united states
Answers: 1
Do you know the correct answer?
As a project manager of Very Good Construction you want to plan renting a fleet of 25 cu yd tractor-...

Questions in other subjects: