Business
Business, 17.04.2020 03:36, ayoismeisjjjjuan

A company anticipates the cost to heat the building will be $21,000. Product A takes up 500 square feet of space, while Product B takes up 200 square feet. The activity rate per product using activity-based costing would be which of the following? A. $30/square foot B. $4.20/square foot C. $11/square foot D. $15.20/square foot

answer
Answers: 2

Other questions on the subject: Business

image
Business, 22.06.2019 02:20, selenaK9514
Archangel manufacturing calculated a predetermined overhead allocation rate at the beginning of the year based on a percentage of direct labor costs. the production details for the year are given below. calculate the manufacturing overhead allocation rate for the year based on the above data. (round your final answer to two decimal places.) a) 42.42% b) 257.14% c) 235.71% d) 1, 206.90% archangel production details.
Answers: 3
image
Business, 22.06.2019 13:50, trillsmith
Read the following paragraph, and choose the best revision for one of its sentences. dr. blake is retiring at the end of the month. there will be an unoccupied office upon his departure, and it is big in size. because every other office is occupied, we should convert dr. blake’s office into a lounge. it is absolutely essential that this issue is discussed at the next staff meeting. (a) because every other office is occupied, it’s recommended that we should convert dr. blake’s office into a lounge. (b) because every other office is filled, we should convert dr. blake’s office into a lounge.
Answers: 2
image
Business, 22.06.2019 20:30, Arealbot
Afirm wants to hire a project manager (pm) at a salary of $100,000. 30% of pms have high ability, and 70% of pms have low ability. high ability pms generate $120,000 in revenue and low ability pms generate $80,000 in revenue. in addition to differences in productivity, high and low ability pms have different outside offers. if a high ability pm is not hired by the firm, she can work for another company at a salary of $80,000. if the low ability pm is not hired by the firm, she can work for another company for $70,000. high ability pms are also able to get a project management professional (pmp) certification at a cost of $1,000. low ability pms are unable to get a pmp certification (they would fail the test). the firm is not able to observe a pm’s ability, but is able to observe and verify whether or not the pm has a pmp certificate.(a) draw the extensive form of the game. expert answer
Answers: 3
image
Business, 22.06.2019 21:50, dontworry48
Abus pass costs $5 per week. which of the following equations shows the total cost in dollars, t, of the bus pass for a certain number of weeks, w? t = 5w w = 5t t = 5 + w w = 5 + t
Answers: 3
Do you know the correct answer?
A company anticipates the cost to heat the building will be $21,000. Product A takes up 500 square f...

Questions in other subjects:

Konu
Mathematics, 16.09.2021 23:20
Konu
Mathematics, 16.09.2021 23:20