An asphalt paving crew is used to pave a 500-foot by 300-foot parking lot. The parking lot will be paved in 12-foot-wide strips running the long (500-foot) direction. The machine paves 11 lineal feet of 12-foot-wide parking lot per minute. A single lift of asphalt will be used on the parking lot. After completing a pass, it takes the crew 10 minutes to turn the paving machine around and get ready for the next pass. The crew consists of a foreperson, six operators, and a laborer. Using a system efficiency of 50 minutes per hour, determine the number of labor hours required to place 1 lineal foot of parking lot 12 feet wide

answer
Answers: 1

Other questions on the subject: Business

image
Business, 22.06.2019 01:30, stmy1969
Someone knows the answer i need in the exam
Answers: 2
image
Business, 22.06.2019 06:10, brooke0713
Amanda works as an industrial designer
Answers: 1
image
Business, 22.06.2019 15:10, GreenHerbz206
Paddock pools constructed a swimming pool and deck for the jensens' home. paddock installed the wrong trim on the pool. it would cost $2800 to change the trim-one-fifth of the total cost of the pool. the jensens refuse to pay anything for the pool. the paddock's best defense is: (a) duress (b) substanial performance (c)mistake (d) failure of conditions
Answers: 3
image
Business, 22.06.2019 15:20, ashleyuchiha123
Gulliver travel agencies thinks interest rates in europe are low. the firm borrows euros at 5 percent for one year. during this time period the dollar falls 11 percent against the euro. what is the effective interest rate on the loan for one year? (consider the 11 percent fall in the value of the dollar as well as the interest payment.)
Answers: 2
Do you know the correct answer?
An asphalt paving crew is used to pave a 500-foot by 300-foot parking lot. The parking lot will be p...

Questions in other subjects: