When the company prepared its planning budget at the beginning of April, it assumed that 32 wells would have been serviced. However, 29 wells were actually serviced during April. The activity variance for total expenses for April would have been closest to: A. $4,200 F B. $1,000 F C. $1,000 U D. $4,200 U

answer
Answers: 3

Other questions on the subject: Business

image
Business, 22.06.2019 05:00, and7393
Xie company identified the following activities, costs, and activity drivers for 2017. the company manufactures two types of go-karts: deluxe and basic. activity expected costs expected activity handling materials $ 625,000 100,000 parts inspecting product 900,000 1,500 batches processing purchase orders 105,000 700 orders paying suppliers 175,000 500 invoices insuring the factory 300,000 40,000 square feet designing packaging 75,000 2 models required: 1. compute a single plantwide overhead rate, assuming that the company assigns overhead based on 125,000 budgeted direct labor hours. 2. in january 2017, the deluxe model required 2,500 direct labor hours and the basic model required 6,000 direct labor hours. assign overhead costs to each model using the single plantwide overhead rate.
Answers: 3
image
Business, 22.06.2019 07:40, perlacruz0505
Shelby company produces three products: product x, product y, and product z. data concerning the three products follow (per unit): product x product y product z selling price $ 85 $ 65 $ 75 variable expenses: direct materials 25.50 19.50 5.25 labor and overhead 25.50 29.25 47.25 total variable expenses 51.00 48.75 52.50 contribution margin $ 34.00 $ 16.25 $ 22.50 contribution margin ratio 40 % 25 % 30 % demand for the company’s products is very strong, with far more orders each month than the company can produce with the available raw materials. the same material is used in each product. the material costs $8 per pound, with a maximum of 4,400 pounds available each month. required: a. compute contribution margin per pound of materials used. (round your intermediate calculations and final answers to 2 decimal places.) contribution margin per pound product x $ product y $ product z $ b. which orders would you advise the company to accept first, those for product x, for product y, or for product z? which orders second? third? product x product y product z
Answers: 3
image
Business, 22.06.2019 14:30, lilquanreem8051
Bridge building company estimates that it will incur $1,200,000 in overhead costs for the year. additionally, the company estimates 50,000 direct labor hours will be spent building custom walking bridges for the year at a total direct labor cost of $600,000. what is the predetermined overhead rate for bridge building company if direct labor costs are to be used as an allocation base?
Answers: 3
image
Business, 23.06.2019 01:00, americanbellabeauty
Jimmy's delicatessen sells large tins of tom tucker's toffee. the deli uses a periodic review system, checking inventory levels every 88 days, at which time an order is placed for more tins. order lead time is 22 days. daily demand is a constant 1515 tins, so average demand during the reorder period and order lead time (1010 days) is 150150 tins. draw a sawtooth diagram. assume that the beginning inventory level is equal to the restocking level and the desired service level is 99.9%. what is the safety stock level? (hint: look at the formula for calculating restocking level.) what is the average inventory level? the safety stock level is average inventory level is __chart: time (10,20,30), tins (0,150) lines touching both axisthe safety stock level is 0 tinsthe average inventory level is 75 tins
Answers: 2
Do you know the correct answer?
When the company prepared its planning budget at the beginning of April, it assumed that 32 wells wo...