Business, 26.03.2020 21:49, lovelyheart5337

Function points in the project: 234 Software engineers assigned to this team: 4 Function point productivity per software engineer: 5 per month Workdays per typical month: 22 Productive hours per typical workday: 8 Gross hourly wage rate per software engineer (does not include fringe benefits): $50 per hour Overhead (fringe benefit, other direct overhead) rate: 32% G&A rate: 11.5% Proposed profit: 10% What is the total cost for the project

answer
Answers: 3

Other questions on the subject: Business

image
Business, 21.06.2019 21:30, haley816
Big trail running company has started to produce running apparel in addition to the trail running shoes that they have manufactured for years. they feel that a departmental overhead rate would best reflect their overall manufacturing overhead usage. based on research the following information was gathered for the upcoming year: machining department finishing department estimated manufacturing overhead by department $ 600 comma 000 $ 400 comma 000 trail running shoes 440 comma 000 machine hours 11 comma 000 direct labor hours running apparel 60 comma 000 machine hours 39 comma 000 direct labor hours manufacturing overhead is driven by machine hours for the machining department and direct labor hours for the finishing department. at the end of the year, the following information was gathered related to the production of the trail running shoes and running apparel: machining department finishing department trail running shoes 442 comma 000 hours 10 comma 500 hours running apparel 57 comma 000 hours 40 comma 000 hours how much manufacturing overhead will be allocated to the trail running shoes
Answers: 3
image
Business, 22.06.2019 11:40, tansebas1107
You are a manager at asda. you have been given the demand data for the past 10 weeks for swim rings for children. you decide to run multiple types of forecasting methods on the data to see which gives you the best forecast. if you were to use exponential smoothing with alpha =.8, what would be your forecast for week 22? (the forecast for week 21 was 1277.) week demand 12 1317 13 1307 14 1261 15 1258 16 1267 17 1256 18 1268 19 1277 20 1277 21 1297
Answers: 3
image
Business, 22.06.2019 14:30, ayoismeisjjjjuan
Amethod of allocating merchandise cost that assumes the first merchandise bought was the first merchandise sold is called the a. last-in, first-out method. b. first-in, first-out method. c. specific identification method. d. average cost method.
Answers: 3
image
Business, 22.06.2019 20:00, BigI80531
Later movers do not face: entrenched competitors. reduced uncertainty over technologies. high growth markets. lower market uncertainty.
Answers: 3
Do you know the correct answer?
Function points in the project: 234 Software engineers assigned to this team: 4 Function point produ...