Business
Business, 24.03.2020 19:31, 23basu3

Mining scenario A mining company owns two mines, each of which produces three grades (high, medium, and low) of ore. The company has a contract to supply a smelting company with at least 12 tons of highgrade ore, at least 8 tons of medium-grade ore, and at least 24 tons of low-grade ore. Each hour of operation, mine 1 produces 6 tons of high- grade ore, 2 tons of medium-grade ore, and 4 tons of low-grade ore. Each hour of operation, mine 2 produces 2 tons of high-grade ore, 2 tons of medium-grade ore, and 12 tons of low-grade ore. It costs $200 per hour to operate mine 1 and $160 per hour to operate mine 2. How many hours should each mine be operated so as to meet the contractual obligations at the lowest total operating cost

answer
Answers: 1

Other questions on the subject: Business

image
Business, 22.06.2019 08:30, elmo4851
Hi inr 2002 class! i just uploaded a detailed study guide for this class. you can check-out a free preview by following the link below feel free to reach-out to me if you need a study buddy or have any questions. goodluck!
Answers: 1
image
Business, 23.06.2019 01:20, swiseman6703
The cook corporation has two divisions--east and west. the divisions have the following revenues and expenses: east westsales $ 603,000 $ 506,000 variable costs 231,000 300,000 traceable fixed costs 151,500 192,000 allocated common corporate costs 128,600 156,000 net operating income (loss) $ 91,900 $ (142,000 )the management of cook is considering the elimination of the west division. if the west division were eliminated, its traceable fixed costs could be avoided. total common corporate costs would be unaffected by this decision. given these data, the elimination of the west division would result in an overall company net operating income (loss) of: multiple choice$91,900$(64,100)$(142,000)$(5 0,100)
Answers: 3
image
Business, 23.06.2019 02:40, Jorianes
Some years ago it was estimated that the demand for steel approximately satisfied the equation p=194-25x x, and the total cost of producing x units of steel was upper c left parenthesis x right parenthesis equals 145 plus 40 x. (the quantity x was measured in millions of tons and the price and total cost were measured in millions of dollars.) determine the level of production and the corresponding price that maximize the profits.
Answers: 3
image
Business, 23.06.2019 08:10, martamsballet
To determine her power usage, samantha divides up her day into three parts: morning, afternoon, and evening. she then measures her power usage at 3 randomly selected times during each part of the day.
Answers: 2
Do you know the correct answer?
Mining scenario A mining company owns two mines, each of which produces three grades (high, medium,...

Questions in other subjects:

Konu
Mathematics, 20.10.2019 01:30