Business
Business, 06.03.2020 15:55, cheylee123456

Wjhich of the U. S. Companies have made fewer manufacturing contracts with china in the last few years

answer
Answers: 2

Other questions on the subject: Business

image
Business, 22.06.2019 13:30, drippyc334
What do you recommend adam do to increase production in a business setting that does not seem to value high productivity?
Answers: 3
image
Business, 22.06.2019 19:50, crzyemo865
Aproduction line has three machines a, b, and c, with reliabilities of .96, .86, and .85, respectively. the machines are arranged so that if one breaks down, the others must shut down. engineers are weighing two alternative designs for increasing the line’s reliability. plan 1 involves adding an identical backup line, and plan 2 involves providing a backup for each machine. in either case, three machines (a, b, and c) would be used with reliabilities equal to the original three. a. compute overall system reliability under plan 1. (round your intermediate calculations and final answer to 4 decimal places.) reliability b. compute overall system reliability under plan 2. (round your intermediate calculations and final answer to 4 decimal places.) reliability c. which plan will provide the higher reliability? plan2plan1
Answers: 3
image
Business, 22.06.2019 20:50, fathimasaynas2975
Lead time for one of your fastest-moving products is 20 days. demand during this period averages 90 units per day. a) what would be an appropriate reorder point? ) how does your answer change if demand during lead time doubles? ) how does your answer change if demand during lead time drops in half?
Answers: 1
image
Business, 22.06.2019 22:00, nsg0686
Acontractor was awarded a purchase order for commercial items for $1.5 million under the authority of far subpart 13.5. the purchase order was issued in november 2010 and containedall applicable clauses that were current as of the date of the purchase order. under the purchase order, the contractor is required to comply with a small business subcontracting plan that contains all of the required elements. which of the following is true? a. the contractor must submit a standard form 294, subcontracting report for individual contracts. b. the contractor must submit an individual subcontracting report through the electronic subcontracting reporting system (esrs). c. the contractor may submit either an sf 294 or report its subcontracting through esrs. d. the contractor is not required to submit any subcontracting reports.
Answers: 1
Do you know the correct answer?
Wjhich of the U. S. Companies have made fewer manufacturing contracts with china in the last few yea...

Questions in other subjects:

Konu
Chemistry, 18.06.2021 01:00