Business
Business, 14.02.2020 05:55, ndunn692

Flag this Question Question 76.25 pts The Happy Cakes Cupcake Factory produces sweet treats using a 6-meter machine-paced conveyor assembly line with six workers placed along it. Each of the six stations performs a different task and at any time, the line has six units of product on it, spaced approximately evenly so that each of the six workers can be working on one of the items. These workers are paid $12/hour for the normal 7 hours that they work on the line each day, with a 50% premium for any overtime work (time-and-a-half). The daily demand for the product being assembled on this line is 2.9 thousand units; this demand is stable. Assume the line must operate at a constant pace, since it is a conveyor belt. 13 sec 4 sec 6 sec 3 sec 6 sec 4 sec What is the current maximum speed in meters per minute that the conveyor belt can run? Please enter your answer rounding to two decimal places (Example: 6.749 would be 6.75).

answer
Answers: 1

Other questions on the subject: Business

image
Business, 21.06.2019 21:00, live4dramaoy0yf9
In addition to having a bachelor's degree in accounting, a certification will increase a tax accountant's job opportunities and allow them to file reports with the
Answers: 1
image
Business, 22.06.2019 13:50, Jessieeeeey
Classify each of the following items as a public good, a private good, a natural monopoly good, or a common resource.(a) measles vaccinations (b) tuna in the pacific ocean (c) airline service in the united states (d) local storm-water system
Answers: 1
image
Business, 22.06.2019 19:50, crzyemo865
Aproduction line has three machines a, b, and c, with reliabilities of .96, .86, and .85, respectively. the machines are arranged so that if one breaks down, the others must shut down. engineers are weighing two alternative designs for increasing the line’s reliability. plan 1 involves adding an identical backup line, and plan 2 involves providing a backup for each machine. in either case, three machines (a, b, and c) would be used with reliabilities equal to the original three. a. compute overall system reliability under plan 1. (round your intermediate calculations and final answer to 4 decimal places.) reliability b. compute overall system reliability under plan 2. (round your intermediate calculations and final answer to 4 decimal places.) reliability c. which plan will provide the higher reliability? plan2plan1
Answers: 3
image
Business, 22.06.2019 20:00, wallsdeandre6927
Richard is one of the leading college basketball players in the state of florida. he also maintains a good academic record. looking at his talent and potential, furman university offers to bear the expenses for his college education.
Answers: 3
Do you know the correct answer?
Flag this Question Question 76.25 pts The Happy Cakes Cupcake Factory produces sweet treats using a...

Questions in other subjects:

Konu
Mathematics, 27.10.2020 16:50
Konu
English, 27.10.2020 16:50