Business, 14.02.2020 00:27, roberth0518
Harrington Corporation produces three products, A, B, and C. Pertinent information on these products is as follows: Product Selling Price per Unit Variable Cost per Unit Fixed Cost per Unit DL Hours per Unit A (Anchor bolts) $4.00 $1.00 $2.00 2 B (Bearings) $3.50 $0.50 $2.00 2 C (Castings) $6.00 $2.00 $3.00 3 There are 150 direct labor hours available. Machine-hour capacity allows 100 anchor bolts, only; 50 bearings, only; 40 casters, only; or any combination of the three that does not exceed the capacity. The direct labor hour constraint for Harrington's linear programming model is:a. A + B + C ≤ 150.b. Min Z = 2A + 2B + 3C. c. Max Z = 2A + 2B + 3C - 150.d. 100A + 50B + 40C ≤ 1,050.e. 2A + 2B + 3C ≤ 150.
Answers: 1
Business, 21.06.2019 15:30, jayzelgaspar8441
Jen heard that the bank where she kept her money was going to close for good. jen said she wasn't worried
Answers: 3
Business, 21.06.2019 20:20, help1572
After all revenue and expense accounts have been closed at the end of the fiscal year, income summary has a debit of $2,450,000 and a credit of $3,000,000. at the same date, retained earnings has a credit balance of $8,222,600, and dividends has a balance of $125,000. required: a. journalize the entries required to complete the closing of the accounts on december 31. refer to the chart of accounts for exact wording of account titles. b. determine the amount of retained earnings at the end of the period.
Answers: 1
Business, 21.06.2019 20:30, heids17043
The link between volume of production and the cost of building manufacturing operations is particularly important in industries characterized byanswers: process innovations. product manufacturing. product innovation. process manufacturing.
Answers: 1
Business, 22.06.2019 05:00, and7393
Xie company identified the following activities, costs, and activity drivers for 2017. the company manufactures two types of go-karts: deluxe and basic. activity expected costs expected activity handling materials $ 625,000 100,000 parts inspecting product 900,000 1,500 batches processing purchase orders 105,000 700 orders paying suppliers 175,000 500 invoices insuring the factory 300,000 40,000 square feet designing packaging 75,000 2 models required: 1. compute a single plantwide overhead rate, assuming that the company assigns overhead based on 125,000 budgeted direct labor hours. 2. in january 2017, the deluxe model required 2,500 direct labor hours and the basic model required 6,000 direct labor hours. assign overhead costs to each model using the single plantwide overhead rate.
Answers: 3
Harrington Corporation produces three products, A, B, and C. Pertinent information on these products...
Mathematics, 30.09.2019 08:30
Mathematics, 30.09.2019 08:30
Mathematics, 30.09.2019 08:30
Physics, 30.09.2019 08:30
Mathematics, 30.09.2019 08:30
Mathematics, 30.09.2019 08:30