Business
Business, 09.12.2019 18:31, aliciaa101

Asignificant part of a manager's job is an orgnisation is to use the tools and techniques developed through ob research to increase organizational
a. structure
b. morale
c. complexity
d. effectiveness

answer
Answers: 3

Other questions on the subject: Business

image
Business, 22.06.2019 12:00, kaylallangari549
In the united states, one worker can produce 10 tons of steel per day or 20 tons of chemicals per day. in the united kingdom, one worker can produce 5 tons of steel per day or 15 tons of chemicals per day. the united kingdom has a comparative advantage in the production of:
Answers: 2
image
Business, 22.06.2019 17:30, leannhb3162
Aproject currently generates sales of $14 million, variable costs equal 50% of sales, and fixed costs are $2.8 million. the firm’s tax rate is 40%. assume all sales and expenses are cash items. (a). what are the effects on cash flow, if sales increase from $14 million to $15.4 million? (input the amount as positive value. enter your answer in dollars not in (b) what are the effects on cash flow, if variable costs increase to 60% of sales? (input the amount as positive value. enter your answers in dollars not in millions). cash flow (increase or decrease) by $
Answers: 2
image
Business, 22.06.2019 19:50, crzyemo865
Aproduction line has three machines a, b, and c, with reliabilities of .96, .86, and .85, respectively. the machines are arranged so that if one breaks down, the others must shut down. engineers are weighing two alternative designs for increasing the line’s reliability. plan 1 involves adding an identical backup line, and plan 2 involves providing a backup for each machine. in either case, three machines (a, b, and c) would be used with reliabilities equal to the original three. a. compute overall system reliability under plan 1. (round your intermediate calculations and final answer to 4 decimal places.) reliability b. compute overall system reliability under plan 2. (round your intermediate calculations and final answer to 4 decimal places.) reliability c. which plan will provide the higher reliability? plan2plan1
Answers: 3
image
Business, 22.06.2019 23:00, andersonmm22
The sign at the bank reads, "wait here for the first available teller," suggests the use of a waiting line system. a. multiple server, single phaseb. random server, single phasec. single server, multiphased. multiple server, multiphasee. dynamic server, single phase
Answers: 2