Business
Business, 25.12.2019 02:31, Jasten

The dulac box plant produces 1000 cypress packing boxes in two 10-hour shifts. what is the productivity of the plant?
a) 25 boxes/hr.
b) 500 boxes/hr.
c) 0.04 boxes/hr.
d) 50 boxes/hr.
e) 5000 boxes/hr.

answer
Answers: 1

Other questions on the subject: Business

image
Business, 22.06.2019 11:40, berlyntyler
Select the correct answer brian wants to add a chart to his dtp project. what is the best way he can do this? a draw the chart using the dtp program draw option b create the chart in a spreadsheet then import it c. use the dtp chart wizard to create the chart within the dtp d. create an image of the chart in an image editor then import the image e use html code to create a chart within the dtp program
Answers: 3
image
Business, 22.06.2019 15:40, kaitlynmorgan43
The cost of direct labor used in production is recorded as a? a. credit to work-in-process inventory account. b. credit to wages payable. c. credit to manufacturing overhead account. d. credit to wages expense.
Answers: 2
image
Business, 22.06.2019 17:50, adamflex
Variable rate cd’s = $90 treasury bills = $150 discount loans = $20 treasury notes = $100 fixed rate cds = $160 money market deposit accts. = $140 savings deposits = $90 fed funds borrowing = $40 variable rate mortgage loans $140 demand deposits = $40 primary reserves = $50 fixed rate loans = $210 fed funds lending = $50 equity capital = $120 a. develop a balance sheet from the above data. be sure to divide your balance sheet into rate-sensitive assets and liabilities as we did in class and in the examples. b. perform a standard gap analysis and a duration analysis using the above data if you have a 1.15% decrease in interest rates and an average duration of assets of 5.4 years and an average duration of liabilities of 3.8 years. c. indicate if this bank will remain solvent after the valuation changes. if so, indicate the new level of equity capital after the valuation changes. if not, indicate the amount of the shortage in equity capital.
Answers: 3
image
Business, 22.06.2019 19:50, joel4676
The new york company produces high quality chairs. variable manufacturing overhead is applied at a standard rate of $12 per machine hour. each chair requires a standard quantity of six machine hours. production for the month totaled 4,000 units. calculate: the standard cost per unit for variable overhead. select one: a. $130,000 b. $192,000 c. $90,000 d. $100,000
Answers: 2
Do you know the correct answer?
The dulac box plant produces 1000 cypress packing boxes in two 10-hour shifts. what is the productiv...

Questions in other subjects:

Konu
Chemistry, 16.10.2019 08:30