Business
Business, 21.12.2019 04:31, lukelara

The structural engineering design section within the engineering department of a regional electrical utility corporation has developed several standard designs for a group of similar transmission line towers. the detailed design for each tower is based on one of the standard designs. a transmission line project involving 46 towers has been approved. the estimated number of engineering hours needed to accomplish the first detailed tower design is 124. assuming a 94% learning curve, what is your estimate of the number of engineering hours needed to design the eighth tower?

answer
Answers: 1

Other questions on the subject: Business

image
Business, 22.06.2019 18:30, thomaskilajuwon
Afarmer is an example of what kind of producer?
Answers: 2
image
Business, 22.06.2019 20:50, fathimasaynas2975
Lead time for one of your fastest-moving products is 20 days. demand during this period averages 90 units per day. a) what would be an appropriate reorder point? ) how does your answer change if demand during lead time doubles? ) how does your answer change if demand during lead time drops in half?
Answers: 1
image
Business, 23.06.2019 01:00, jaaja
While on vacation in las vegas jennifer, who is from utah, wins a progressive jackpot playing cards worth $15,875 at the casino royale. what implication does she encounter when she goes to collect her prize?
Answers: 3
image
Business, 23.06.2019 02:30, maymaaz
Harmon inc. produces joint products l, m, and n from a joint process. information concerning a batch produced in may at a joint cost of $75,000 was as follows:
Answers: 3
Do you know the correct answer?
The structural engineering design section within the engineering department of a regional electrical...

Questions in other subjects: