Business, 05.12.2019 19:31, evazquez

If a sample of parts is measured and the mean of the measurements is outside the upper or lower control limits, the process is: a. in control, but not capable of producing within the established control limits. b. out of control and the process should be investigated for assignable variation. c. within the established control limits with only natural causes of variation. d. monitored closely to see if the next sample mean will also fall outside the control limits. reset selection

answer
Answers: 1

Other questions on the subject: Business

image
Business, 21.06.2019 21:00, yasarhan2
Suppose an economist believes that the price level in the economy is directly related to the money supply, or the amount of money circulating in the economy. the economist proposes the following relationship: p=a x m - p=price level - m=money supply - a=a composite of other factors, including real gdp, that change very slowly over time. how might an economist gather empirical data to test the proposed relationship between money and the price level? an economist would persuade the federal reserve to change the money supply to various levels, and observe the resulting changes in the price level. unlike researchers in the hard sciences, economists cannot study complex relationships using data. economists do not usually develop theoretical models of the economy but only analyze summary statistics about the current state of the economy. an economist would look for data on past changes in the money supply, and note the resulting changes in the price level
Answers: 1
image
Business, 21.06.2019 21:00, shelbycade230
Following is a list of various costs incurred in producing replacement automobile parts. with respect to the production and sale of these auto parts, classify each cost as either variable costs, fixed costs, or mixed costs. 1. oil used in manufacturing equipment 2. plastic 3. property taxes, $165,000 per year on factory building and equipment 4. salary of plant manager 5. cost of labor for hourly workers 6. packaging 7. factory cleaning costs, $6,000 per month 8. metal 9. rent on warehouse, $10,000 per month plus $25 per square foot of storage used 10. property insurance premiums, $3,600 per month plus $0.01 for each dollar of property over $1,200,000 11. straight-line depreciation on the production equipment 12. hourly wages of machine operators 13. electricity costs, $0.20 per kilowatt-hour 14. computer chip (purchased from a vendor) 15. pension cost, $1.00 per employee hour on the job
Answers: 3
image
Business, 22.06.2019 02:30, llama1314
Sweeten company had no jobs in progress at the beginning of march and no beginning inventories. the company has two manufacturing departments--molding and fabrication. it started, completed, and sold only two jobs during march—job p and job q. the following additional information is available for the company as a whole and for jobs p and q (all data and questions relate to the month of march): molding fabrication total estimated total machine-hours used 2,500 1,500 4,000 estimated total fixed manufacturing overhead $ 10,000 $ 15,000 $ 25,000 estimated variable manufacturing overhead per machine-hour $ 1.40 $ 2.20 job p job q direct materials $ 13,000 $ 8,000 direct labor cost $ 21,000 $ 7,500 actual machine-hours used: molding 1,700 800 fabrication 600 900 total 2,300 1,700 sweeten company had no underapplied or overapplied manufacturing overhead costs during the month. required: for questions 1-8, assume that sweeten company uses a plantwide predetermined overhead rate with machine-hours as the allocation base. for questions 9-15, assume that the company uses departmental predetermined overhead rates with machine-hours as the allocation base in both departments. 1. what was the company’s plantwide predetermined overhead rate? (round your answer to 2 decimal places.) next
Answers: 2
image
Business, 22.06.2019 20:30, anilauferc
You are in the market for a new refrigerator for your company’s lounge, and you have narrowed the search down to two models. the energy efficient model sells for $700 and will save you $45 at the end of each of the next five years in electricity costs. the standard model has features similar to the energy efficient model but provides no future saving in electricity costs. it is priced at only $500. assuming your opportunity cost of funds is 6 percent, which refrigerator should you purchase
Answers: 3
Do you know the correct answer?
If a sample of parts is measured and the mean of the measurements is outside the upper or lower cont...

Questions in other subjects:

Konu
Mathematics, 14.07.2019 18:00
Konu
Mathematics, 14.07.2019 18:00