Business
Business, 26.11.2019 21:31, ryan1kk

If you are under 21, how do you receive a credit
card?

answer
Answers: 1

Other questions on the subject: Business

image
Business, 21.06.2019 16:30, jasmin2344
What is the purpose of government health care programs
Answers: 1
image
Business, 21.06.2019 18:40, paulusl19
Alyssa works for an engineering firm that has been hired to design and supervise the construction of a highway bridge over a major river. the bridge will be a unique design, incorporating complex designs that will likely never be duplicated. how should alyssa deal with designing and overseeing the building of the bridge?
Answers: 3
image
Business, 22.06.2019 05:50, mandy9386
Nichols inc. manufactures remote controls. currently the company uses a plantminuswide rate for allocating manufacturing overhead. the plant manager is considering switchingminusover to abc costing system and has asked the accounting department to identify the primary production activities and their cost drivers which are as follows: activities cost driver allocation rate material handling number of parts $5 per part assembly labor hours $20 per hour inspection time at inspection station $10 per minute the current traditional cost method allocates overhead based on direct manufacturing labor hours using a rate of $20 per labor hour. what are the indirect manufacturing costs per remote control assuming an method is used and a batch of 10 remote controls are produced? the batch requires 100 parts, 5 direct manufacturing labor hours, and 3 minutes of inspection time.
Answers: 2
image
Business, 22.06.2019 07:30, suyi14
An important application of regression analysis in accounting is in the estimation of cost. by collecting data on volume and cost and using the least squares method to develop an estimated regression equation relating volume and cost, an accountant can estimate the cost associated with a particular manufacturing volume. consider the following sample of production volumes and total cost data for a manufacturing operation. production volume (units) total cost ($) 400 4000 450 5000 550 5400 600 5900 700 6400 750 7000 compute b 1 and b 0 (to 2 decimals if necessary). b 1 b 0 complete the estimated regression equation (to 2 decimals if necessary). = + x what is the variable cost per unit produced (to 1 decimal)? $ compute the coefficient of determination (to 4 decimals). note: report r 2 between 0 and 1. r 2 = what percentage of the variation in total cost can be explained by the production volume (to 2 decimals)? % the company's production schedule shows 500 units must be produced next month. what is the estimated total cost for this operation (to 2 decimals)? $
Answers: 1
Do you know the correct answer?
If you are under 21, how do you receive a credit
card?...

Questions in other subjects:

Konu
Mathematics, 05.09.2020 19:01