The master budget of windy co. shows that the planned activity level for next year is expected to be 50,000 machine hours. at this level of activity, the following manufacturing overhead costs are expected: indirect labor $ 720,000 machine supplies 180,000 indirect materials 210,000 depreciation on factory building 150,000 total manufacturing overhead $1,260,000 a flexible budget for a level of activity of 60,000 machine hours would show total manufacturing overhead costs of group of answer choices a. $1,362,000 b. $1,512,000 c. $1,482,000 d. $1,260,000.

answer
Answers: 1

Other questions on the subject: Business

image
Business, 21.06.2019 17:10, LolaSalem
Diggity dank corporation uses an activity-based costing system with two activity cost pools. diggity dank uses direct labor hours as the measure of activity in the first activity cost pool and the number of orders in the second activity cost pool. the following information relates to these two activity cost pools for last year: what was diggity dank's under- or overapplied overhead for last year? a. $17,000 overapplied b. $20,000 underapplied c. $27,000 underapplied d. $73,000 overapplied
Answers: 1
image
Business, 22.06.2019 03:00, zelds63481
Which of the following is an effective strategy when interest rates are falling? a. use long-term loans to take advantage of current low rates. b. use short-term loans to take advantage of lower rates when you refinance a loan. c. deposit to a short-term savings instrumentals to take advantage of higher interest rates when they mature. d. select short-term savings instruments to lock in earnings at a current high rates.
Answers: 1
image
Business, 22.06.2019 15:10, hvvhvc
Paying attention to the purpose of her speech, which questions can she eliminate? a. 1 and 2 b. 3 c. 2 and 4 d. 1-4
Answers: 2
image
Business, 22.06.2019 17:00, PlzNoToxicBan
Cadbury has a chocolate factory in dunedin, new zealand. for easter, it makes two kinds of “easter eggs”: milk chocolate and dark chocolate. it cycles between producing milk and dark chocolate eggs. the table below provides data on these two products. demand (lbs per hour) milk: 500 dark: 200 switchover time (minutes) milk: 60 dark: 30 production rate per hour milk: 800 dark: 800 for example, it takes 30 minutes to switch production from milk to dark chocolate. demand for milk chocolate is higher (500lbs per hour versus 200 lbs per hour), but the line produces them at the same rate (when operating): 800 lbs per hour. a : suppose cadbury produces 2,334lbs milk chocolate and 1,652 lbs of dark chocolate in each cycle. what would be the maximum inventory (lbs) of milk chocolate? b : how many lbs of milk and dark chocolate should be produced with each cycle so as to satisfy demand while minimizing inventory?
Answers: 2
Do you know the correct answer?
The master budget of windy co. shows that the planned activity level for next year is expected to be...