Business
Business, 13.11.2019 05:31, lizdeleon248

Music venue is a concert organizer that is evaluating the installation if portable toilets in the arena where a concert is going to take place. in particular they are considering giving service to a part of the complex that is far away from the existing restrooms. assume there will be one single queue to access all the portable toilets in this area and that only one person uses a toilet at a time. there are 2 arrivals per minute on average, the standard deviation of the time between arrivals is 15 seconds, and the average time a person spends in the toilet is 4 minutes (with standard deviation of 1 minute). mv1. what is the average utilization of 10 toilets? mv2. what is the expected time a customer will have to wait? mv3. how long will the average toilet be empty during a 5-hour concert? mv4. what is going to be the average number of people in the queue? (your answer does not have to be an integer).

answer
Answers: 1

Other questions on the subject: Business

image
Business, 21.06.2019 18:30, sash0924
Why should organizations be allowed to promote offensive, violent, sexual, or unhealthy products that can be legally sold and purchased?
Answers: 3
image
Business, 22.06.2019 02:30, llama1314
Sweeten company had no jobs in progress at the beginning of march and no beginning inventories. the company has two manufacturing departments--molding and fabrication. it started, completed, and sold only two jobs during march—job p and job q. the following additional information is available for the company as a whole and for jobs p and q (all data and questions relate to the month of march): molding fabrication total estimated total machine-hours used 2,500 1,500 4,000 estimated total fixed manufacturing overhead $ 10,000 $ 15,000 $ 25,000 estimated variable manufacturing overhead per machine-hour $ 1.40 $ 2.20 job p job q direct materials $ 13,000 $ 8,000 direct labor cost $ 21,000 $ 7,500 actual machine-hours used: molding 1,700 800 fabrication 600 900 total 2,300 1,700 sweeten company had no underapplied or overapplied manufacturing overhead costs during the month. required: for questions 1-8, assume that sweeten company uses a plantwide predetermined overhead rate with machine-hours as the allocation base. for questions 9-15, assume that the company uses departmental predetermined overhead rates with machine-hours as the allocation base in both departments. 1. what was the company’s plantwide predetermined overhead rate? (round your answer to 2 decimal places.) next
Answers: 2
image
Business, 22.06.2019 08:30, shauntleaning
Match the given situations to the type of risks that a business may face while taking credit. 1. beta ltd. had taken a loan from a bank for a period of 15 years, but its sales are gradually showing a decline. 2. alpha ltd. has taken a loan for increasing its production and sales, but it has not conducted any research before making this decision. 3. delphi ltd. has an overseas client. the economy of the client’s country is going through severe recession. 4. delphi ltd. has taken a short-term loan from the bank, but its supply chain logistics are not in place. a. foreign exchange risk b. operational risk c. term of loan risk d. revenue projections risk
Answers: 3
image
Business, 22.06.2019 15:00, aesthetickait
(a) what was the opportunity cost of non-gm food for many buyers before 2008? (b) why did they prefer the alternative? (c) what was the opportunity cost in 2008? (d) why did it change?
Answers: 2
Do you know the correct answer?
Music venue is a concert organizer that is evaluating the installation if portable toilets in the ar...

Questions in other subjects: