Business
Business, 31.10.2019 00:31, daebreonnakelly

Deemer corporation has an activity-based costing system with three activity cost pools--processing, supervising, and other. in the first stage allocations, costs in the two overhead accounts, equipment expense and indirect labor, are allocated to the three activity cost pools based on resource consumption. data used in the first stage allocations follow: overhead costs: equipment expense $ 93,000indirect labor $ 5,100distribution of resource consumption across activity cost pools: activity cost poolsprocessing supervising otherequipment expense 0.50 0.30 0.20indirect labor 0.50 0.30 0.20processing costs are assigned to products using machine-hours (mhs) and supervising costs are assigned to products using the number of batches. the costs in the other activity cost pool are not assigned to products. activity data for the company's two products follow: activity: mhs (processing) batches (supervising)product f6 10,500 1,320product x0 1,360 1,320total 11,860 2,640what is the overhead cost assigned to product x0 under activity-based costing? (round your intermediate calculations to 2 decimal places.)multiple choice$14,718.00$30,326.00$5,630.40 $20,348.00

answer
Answers: 2

Other questions on the subject: Business

image
Business, 22.06.2019 21:50, sippincoronas
Q3. loral corporation manufactures parts for an aircraft company. it uses a computerized numerical controlled (cnc) machining center to produce a specific part that has a design (nominal) target of 1.275 inches with tolerances of ± 0.020 inch. the cnc process that manufactures these parts has a mean of 1.285 inches and a standard deviation of 0.005 inch. compute the process capability ratio and process capability index, and comment on the overall capability of the process to meet the design specifications.
Answers: 1
image
Business, 22.06.2019 23:00, tonya3498
Which of the following is not one of the four principles of bottleneck management? a. increasing capacity at non-bottleneck stations is a mirageb. lost time at the bottleneck is lost system capacity. c. release work orders to the system at the bottleneck's capacity pace. d. increased bottleneck capacity is increased system capacity. e. bottlenecks should be moved to the end of the system process.
Answers: 1
image
Business, 23.06.2019 00:40, briarkaltvedt
You are a team of marketing consultants. it is 2008 and the great recession has struck. one of your clients is whole foods market (sometimes known as whole paycheck). wfm has come to you and asked for strategic advice on how to adapt their product and pricing strategies in light of the economic downturn: 1. advise wfm on the various approaches that could be taken to reducing price. be sure to consider potential psychological impact of price reductions on wfm consumers. 2. based on the options outlined in part 1, recommend an approach and support with marketing theory.
Answers: 2
image
Business, 23.06.2019 03:20, brittanysanders
Draw, label and explain the circular flow model (cfm). include the following: firms, households, product market, and factor (or resource) market. who owns the productive resources? what are those resources? what payment does each type of resource earn? explain the two markets in the cfm and explain the roles that firms and household each play in the cfm.
Answers: 2
Do you know the correct answer?
Deemer corporation has an activity-based costing system with three activity cost pools--processing,...

Questions in other subjects:

Konu
Physics, 01.12.2020 20:30
Konu
Mathematics, 01.12.2020 20:30
Konu
Mathematics, 01.12.2020 20:30