Electric zero produces relay units for generators. each relay has a standard material cost of $67. standards call for two relays per generator. in july, the company purchased 120 relays for $7,560. the company used 104 relays in the production of 50 generators, with 4 relays damaged in the installation process. the standard quantity of labor is 20 hours per generator, with a standard wage rate of $23. the company incurred 1,020 labor hours at a cost of $22,950. how much is the material quantity variance?

answer
Answers: 1

Other questions on the subject: Business

image
Business, 22.06.2019 07:40, tipbri6380
(a) what was the opportunity cost of non-gm food for many buyers before 2008? (b) why did they prefer the alternative? (c) what was the opportunity cost in 2008? (d) why did it change?
Answers: 3
image
Business, 22.06.2019 22:20, arisworlld
With q7 assume the sweet company uses a plantwide predetermined overhead rate with machine-hours as the allocation base. and for q 10,11,13,and 14,assume that the company use department predetermined overhead rates with machine-hours as the allocation bade in both departements.7. assume that sweeten company used cost-plus pricing (and a markup percentage of 80% of total manufacturing cost) to establish selling prices for all of its jobs. what selling price would the company have established for jobs p and q? what are the selling prices for both jobs when stated on a per unit basis assuming 20 units were produced for job p and 30 units were produced for job q? (do not round intermediate calculations. round your final answers to nearest whole dollar.)total price for the job for job p -job q selling price per unit for job p q . how much manufacturing overhead was applied from the molding department to job p and how much was applied to job q? (do not round intermediate calculations.) job p job q manufacturing overhead applied for job p for job q . how much manufacturing overhead was applied from the fabrication department to job p and how much was applied to job q? (do not round intermediate calculations.)job p job q manufacturing overhead applied for job p for job q . if job q included 30 units, what was its unit product cost? (do not round intermediate calculations. round your final answer to nearest whole dollar.)14. assume that sweeten company used cost-plus pricing (and a markup percentage of 80% of total manufacturing cost) to establish selling prices for all of its jobs. what selling price would the company have established for jobs p and q? what are the selling prices for both jobs when stated on a per unit basis assuming 20 units were produced for job p and 30 units were produced for job q? (do not round intermediate calculations. round your final answer to nearest whole dollar.)total price for the job p for job q selling price per unit for job p for job q
Answers: 1
image
Business, 23.06.2019 00:00, makayyafreeman
According to the video, the gross national product had declined from $104 billion in 1929 to about in 1933.
Answers: 2
image
Business, 23.06.2019 02:00, kyralynn123
You are considering the purchase of one of two machines used in your manufacturing plant. machine 1 has a life of two years, costs $20,000 initially, and then $4,000 per year in maintenance costs. machine 2 costs $25,000 initially, has a life of three years, and requires $3,500 in annual maintenance costs. either machine must be replaced at the end of its life with an equivalent machine. using eac which is the better machine for the firm