Answers: 2
Business, 21.06.2019 20:00, tiannaetzel
During 2017, sheridan company expected job no. 26 to cost $300000 of overhead, $500000 of materials, and $200000 in labor. sheridan applied overhead based on direct labor cost. actual production required an overhead cost of $260000, $510000 in materials used, and $150000 in labor. all of the goods were completed. what amount was transferred to finished goods?
Answers: 1
Business, 22.06.2019 05:20, lauren21bunch
142"what is the value of n? soefon11402bebe99918+19: 00esseeshop60-990 0esle
Answers: 1
Business, 22.06.2019 15:20, iselloutt4fun
Kelso electric is debating between a leveraged and an unleveraged capital structure. the all equity capital structure would consist of 40,000 shares of stock. the debt and equity option would consist of 25,000 shares of stock plus $280,000 of debt with an interest rate of 7 percent. what is the break-even level of earnings before interest and taxes between these two options?
Answers: 2
Business, 22.06.2019 15:40, brashley
Acompany manufactures x units of product a and y units of product b, on two machines, i and ii. it has been determined that the company will realize a profit of $3 on each unit of product a and $4 on each unit of product b. to manufacture a unit of product a requires 7 min on machine i and 5 min on machine ii. to manufacture a unit of product b requires 8 min on mchine i and 5 min on machine ii. there are 175 min available on machine i and 125 min available on machine ii in each work shift. how many units of a product should be produced in each shift to maximize the company's profit p?
Answers: 2
Alex needs a car for a year. which option below would be the cheapest for that length of time? assu...